My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150295 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150295 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:29 PM
Creation date
10/14/2009 1:08:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-038
C150295
Contractor Name
Dillon, Town of
Contract Type
Loan
Water District
0
County
Summit
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
787
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Apnlication <br />4. Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. Attach separate sheets if needed, <br />and a map of the service area. Please see attached description <br />For existing facilities indicate: <br />Number of shareholders NA or Number of customers served 428 <br />Current Assessment per share $ NA Number of shares NA <br />Number of acres irrigated 37 Water Right: 13.5 CFS. <br />Average water diverted per year <br />Part B. - Description of the Project <br />1. Name of the project or facility <br />321.35 acre-feet. <br />Old Dillon Reservoir Enlargement Project <br />2. Purpose of this loan application. Check one. <br />New project <br />X Rehabilitation or replacement of existing facility <br />X Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES X NO <br />4. General location of the project. (Please include county, and approximate distance and <br />direction from nearest town, as well as legal description, if known. See attached <br />5. Please provide a brief narrative description of the proposed project including purpose, <br />need, facilities, type of water uses to be served and service area. Attach separate sheet, if <br />needed. See Attached <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.