My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150295 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150295 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:29 PM
Creation date
10/14/2009 1:08:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-038
C150295
Contractor Name
Dillon, Town of
Contract Type
Loan
Water District
0
County
Summit
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
787
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. J. Eric Holgerson Page 2 <br />July 17, 2008 <br />is in your best interest to operate and maintain the facility in a manner such that the safety of the dam <br />and the general public are not jeopardized. <br />Presently it is planned to rehabilitate and enlarge this dam to 250 AF with preliminary work <br />occurring next year after the reservoir is drained this fall and then the actual dam enlargement work <br />occurring in 2010. You must engage a professional engineer registered in the State of Colorado with <br />dam design and construction experience to prepare plans and specifications for this work. The design <br />and construction documents need to be submitted in a timely manner for our review in order for the <br />work to be performed in 2010. Similar submittals are also required to allow storage even if it is <br />decided to not enlarge the dam. Upon approval of the plans and specifications and completion of the <br />construction, this office will make a final inspection. After the construction has been inspected and <br />found satisfactory, the storage restriction will be lifted. <br />We will appreciate your cooperation in this matter and ensuring that a safe structure to store <br />water at this site is achieved. Should you have any questions please contact John G. Blair in our <br />Glenwood Springs office at (970) 945-5665, ext 5016. <br />~. <br />Sincerely, <br />I' ^ ~~ <br />ic olfe, P.E. <br />Director and State Engineer <br />Enclosures: Inspection report and pictures <br />xc: Alan Martellaro, Division Engineer (with enclosures) <br />Scott Hummer, Water Commissioner (with enclosures) <br />John G. Blair, Division 5 Dam Safety Engineer (with enclosures) <br />Mark Haynes, Chief of the Safety of Dams Program (with enclosures) <br />USFS Rocky Mountain Region (with enclosures) <br />USFS, Arapahoe National Forest (with enclosures) <br />MRH/JGB/gld:c:word/damsafety/Old Dillon Zero Storage 7-OS <br />
The URL can be used to link to this page
Your browser does not support the video tag.