My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150295 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150295 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:29 PM
Creation date
10/14/2009 1:08:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-038
C150295
Contractor Name
Dillon, Town of
Contract Type
Loan
Water District
0
County
Summit
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
787
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.4.3 Cost Estimate <br />1. Reservoit Enlaxgement $1,460,000 <br />2. Resto~ing the outlet fxom Old Dillon Reservoir <br />to the south to the Blue RiveY $ 460,000 <br />3. Rehabilitation and modification of Dillon Ditch <br />and its headgate on Salt Lick Gulch to serve the <br />enlarged reservoir $1,400,000 <br />4. Rehabilitating the oudet to Salt Lick Gulch $ 460,000 <br />5. Tempoxary road access impxovements $ 502,000 <br />6. Burying overhead power and cable lines $ 100,000 <br />7. Wedands Creation $ 243,000 <br />Construction Costs $4,625,000 <br />Contingency 20% $ 925,000 <br />Design/EngineeYing Fees $ 765,000 <br />Total PYOject Costs $6,315,000 <br />2.4.4 Implementation Schedule <br />To Date <br />February 2009 <br />End of April, 2009 <br />Mid Suizunex 2009 <br />End of August 2009 <br />OctobeY 2009 <br />January 2010 <br />April 2010 <br />December 2010 <br />Spring 2011 <br />2.4.5 Impacts <br />Completed 90% Engineering Construction Plans <br />Submitted USFS Permit <br />Submitted DYaft EnviYOnmental Assessment <br />Subxnit County 1041 Permit <br />Submit Army Corp 404 Permit <br />AdveYtise foY Bids <br />Award Bids <br />Contxact of Successful Bidder Signed <br />Begin Construction <br />Project Complerion <br />Fill Old Dillon Reservoir <br />The Environmental Assessment being prepared foY the White RiveY National FoYest will <br />disclose the envitonmental effects associated with the construction, operation and <br />maintenance of the enlarged Yeservoir. This document will be available upon Yelease for <br />public comment mid-Apxil to mid-May, 2009. Below is the table of contents: _ _ <br />CHAPTER 1.0 PROPOSED ACTION AND ITS PURPOSE AND NEED <br />1.1 INTRODUCTION <br />1.1.1 PROPOSED ACTION <br />1.1.2 PURPOSE AND NEED <br />1.2 DECISION TO BE MADE <br />1.2.1 PUBLIC INVOLVEMENT <br />1.3 ISSUES <br />1.4 PERMITS AND AGENCY APPROVALS REQUIRED <br />CHAPTER 2.0 ALTERNATIVES INCLUDING THE PROPOSED ACTION <br />2.1 INTRODUCTION <br />2.1.1 FORM[JLATION OF ALTERNATIVES <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.