Laserfiche WebLink
<br />TABLE 4. SUMMARY OF WIRSOS INPUT FOR POWDER WASH PROJECT <br />Little Snake Reservoir Data <br />Storage right, priority date of 9-27-77 <br />Minimum active storage volume <br />Maximum active storage volume <br />Maximum primary outlet capacity <br />Initial storage volume at beginning <br />of study period (70% Total) <br />= 164,690 AF (1 annual fill only) <br />0 AF <br />164,690 AF <br />1,000 cfs <br />= 115,000 AF <br />Area - Capacity relationship (developed by WWC from available mapping, see <br />Appendix C) <br />Powder Wash Power Plant Discharge Data <br />Water right, priority date of 9-27-77 = 800 cfs <br />Average approximate demand = 225 cfs <br />(Demand amount to be refined during firm yield study) <br />28