My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7415
CWCB
>
UCREFRP
>
Public
>
7415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:56 AM
Creation date
8/10/2009 3:35:21 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7415
Author
U.S. Fish and Wildlife Service.
Title
Flaming Gorge Peaking Power Study-Preliminary Draft.
USFW Year
1988.
USFW - Doc Type
Denver, Colorado.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The third recorder was not installed until late July 1987 because <br />permission was not obtained from the Ute Indians until the spring <br />runoff had begun. The recorder was installed at the site of a <br />former USGS gage which was discontinued in the 1960's. This <br />recorder has been operating successfully since its installation <br />and has only two gaps in the record. One gap was caused from our <br />testing a weatherization technique, and the other occurred <br />because of a clock malfunction. The weatherization technique <br />being tested consisted of placing styrofoam peanuts in the <br />stilling well to prevent freezing. This technique failed <br />completely as the float became jammed and data was lost for <br />several weeks. This problem occurred at all three recorders <br />during mid-November 1987. The amount of styrofoam was reduced in <br />early November and the gages functioned through the winter. <br />Concurrent with the installation and operation of the recorders, <br />Service staff took width, depth and velocity measurements at each <br />of the recorder sites. These measurements were then used to <br />develop stage vs flow relationships for each of the recorder <br />sites. During 1987, two measurements were taken at Mitten Park <br />and Ouray Refuge, and one measurement was taken at Tia Juana <br />Bottom. Flows measured at Mitten Park were 1,424 cfs and <br />2,416 cfs. Flows Measured at Ouray refuge were 2,039 and <br />4,398 cfs. The single flow measured at Tia Juana Bottom was <br />2,160 cfs. <br />Based upon these measurements, rating tables were developed for <br />Mitten Park and the Ouray Refuge. The rating table relationships <br />were first developed graphically by plotting the flow vs stage <br />and a equation for the line derived. The rating table was then <br />developed by plugging the equation into Lotus and incrementing <br />the stage. A rating table for Tia Juana Bottom could not be <br />developed based upon one measurement. <br />During January of 1988, discussions were held with the Bureau and <br />a target flow of 6,000 cfs was established for the upper <br />measurement at the Mitten Park and Ouray Refuge sites. This <br />target was used to represent the usual summer condition when <br />Flaming Gorge is peaking between 1,200 cfs and 4,200 cfs, and the <br />Yampa is contributing up to 2,000 cfs. This would produce rating <br />tables which were considerably more accurate at lower flows than <br />those produced with higher flows out of the range that are to be <br />considered in the study. <br />During the 1988 spring runoff period, an effort was made to get <br />additional measurements at the three recorders when the flow at <br />Jensen was in the 6,000 cfs range. Flows of 7,639 cfs, 6,442 <br />cfs, and 7,673 cfs were measured at Mitten Park, Ouray, and Tia <br />Juana Bottom respectively. The flow at the Mitten Park site was <br />a little higher than planned, but was the best that could be <br />obtained with unpredictable weather conditions. <br />5
The URL can be used to link to this page
Your browser does not support the video tag.