Laserfiche WebLink
<br />Table 3.--Proposed reservoirs used in modeZ anaZysis <br /> <br /> . Option <br /> Proposed storage <br />Proposed reservoir Stream capac i ty <br /> (acre-feet) 2 3 4 <br />Bear1------------- Yampa River 11,610 X <br />Cross Mountain1--- Yampa River 142,000 X X X <br />Juniper1---------- Yampa River 1,079,990 X X X <br />Yamcolo1---------- Bear River 9,000 X X X X <br />Blacktail--------- Yampa River 229,250 X X X <br />Childress--------- Trout Creek 24, 160 X X X <br />Lower Green------- Green Creek 99,600 X X X <br />Lower Middle------ Middle Creek 25,150 X X X <br />Upper Middle------ Middle Creek 102,200 X X X <br />Pot Hook1--------- Slater Fork 60,000 X X X <br />Sandstone1-------- Savery Creek 15,500 X X X <br />California Park1-- Elkhead Creek 36,540 X X <br />Craig1------------ Yampa River 44,490 X X <br />Dunckleyl--------- Fish Creek 57,090 X X <br />Grouse.Mountain--- Wi llow Creek 79,260 X X <br />Hinman Park------- Elk River 44,040 X X <br />Pleasant Valleyl-- Yampa River 43,220 X X <br />IProposed diversions for agricultural use. <br /> <br />Some of the proposed larger reservoir complexes considered in this study <br />include: (1) Juniper and Cross Mountain project (Colorado River Water Conservation <br />District, 1975); (2) Oak Creek Water and Power Project (Oak Creek Power Company, <br />1976), which includes the following proposed reservoirs: Blacktail, Lower Green, <br />Upper and Lower Middle, and Childress; (3) Savery-Pot Hook project (U.S. Depart- <br />ment of the Interior, 1976); and (4) Yamcolo project (Western Engineers, Inc., <br />1975). The proposed Pleasant Valley Reservoir is an expansion of the existing Lake <br />Catamount Reservoir (Woodward-Clyde Consultants, 1977). <br /> <br />PROPOSED DIVERSIONS USED IN THE MODEL <br /> <br />Diversions associated with reservoir development in the Yampa River basin are <br />proposed for agricultural, industrial, and municipal use within the basin, and <br />municipal use outside the basin (transmountain diversions). In the model simula- <br />tions, the proposed diversions for agricultural use within the basin were varied <br />by using percentage water-use allol:ations (25, 50, 75, and 100 percent) of the <br /> <br />11 <br />