My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7041
CWCB
>
UCREFRP
>
Public
>
7041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 11:32:55 AM
Creation date
8/10/2009 12:31:31 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7041
Author
Upper Colorado River Commission.
Title
Forty-Third Annual Report of the Upper Colorado River Commission
USFW Year
1991.
USFW - Doc Type
Colorado River Storage Project and Participating Projects.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A contract was awarded in September of 1989 to install the master <br />computer control system and is scheduled for completion during the <br />summer of 1992. A contract to install the communications system for the <br />master computer control system was awarded in July of 1989 with <br />completion also scheduled for the summer of 1992. <br /> <br />A contract for construction of the recreational facilities below McPhee <br />Dam along the Dolores River was awarded in September of 1989. The <br />contract performance period will continue through fiscal year 1992. <br /> <br />The first payment for Block Notice Number One, issued on March 23, <br />1987 to the Dolores Water Conservancy District, was received in February <br />of 1990. That notice is for all irrigable land using supplemental water <br />within the Montezuma Valley Irrigation eompany's system. <br /> <br />Block Notice Number Four was issued on September 4, 1990 and <br />covers all irrigable lands within the Fairview and Cahone full-service <br />pipeline lateral delivery systems. The notice is for 27,644 acre-feet of <br />water. Repayment will begin on February 1, 1997. <br /> <br />Block Notice Number Five was issued to the Ute Mountain Ute Indian <br />Tribe for 1,000 acre-feet ofM&! water. Pursuant to the eolorado Ute <br />Indian Water Rights Settlement Act of 1988, the first repayment on <br />February 1, 1991 will be for 160 acre-feet of water. Repayment on the <br />remaining 840 acre-feet will be held until the water is first used. <br /> <br />Block Notice Number Two was issued on May 29, 1987, and Block <br />Notice Number Three was issued on February 22, 1988. <br /> <br />c. Fruitland Mesa Project <br /> <br />Reclamation has requested that all the lands previously withdrawn for <br />the Fruitland Mesa Project be terminated in their entirety. Through the <br />Withdrawal Review Report submitted to the Bureau of Land Manage- <br />ment (BLM), Reclamation has recommended that approximately 22,600 <br />acres be returned to the public domain. <br /> <br />d. San Miguel Project - West Divide Project <br /> <br />Both projects have been found to be economically unjustified at this <br />time. No activity has occurred on either project since 1982. <br /> <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.