Laserfiche WebLink
<br />. <br /> <br />A problem with this concept is a lack of time: <br /> <br />1. FWS has set a deadline of October 1 to <br />define an approach to resolving the endan- <br />gered fish problem. <br /> <br />2. Given past precedent, it is doubtful that <br />the technical committees can provide <br />sufficient information by October .1. <br /> <br />3. There is no plan or schedule for the <br />Steering Committee's actions even if <br />information is received. <br /> <br />4. If non-flow alternatives are to be consid- <br />ered, technical input is required for <br />sufficient definition of alternatives to <br />allow adequate analysis. No time has been <br />allowed for such definition. <br /> <br />If there is a genuine intent to review alternatives <br />not related to flow restrictions, the F~IS schedule is <br />not sufficient. <br /> <br />-11- <br />