My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15d_Directors Report
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
15d_Directors Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:50 PM
Creation date
8/5/2009 12:01:44 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/21/2009
Description
Directors' Report - CWCB Director
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the Company, it evaluated a lternatives to both improve the safety conditions for its employees <br />and more efficiently operate the gate. The Company has chosen to replace the existing board <br />gates with a new radial gate. Construction is expected to occur in the fall of 2009. <br />10 . Sout h Metro Water Supply Authority – Raw Water Delivery <br />Authorization: Construction Fund County: Adams/Denver/etc. <br />Water Source: South Platte Project Yield: 10,750 acre - feet <br />Terms of Loan: $5,090,400 @ 4 .50% for 3 0 yrs. Projec t Type: Raw Water Delivery <br />S outh Metro Water Supply Authority (Authority) is made up of 13 independent water providers <br />that serve communities in the southern area of metro Denver. Currently, the Authority members <br />rely mainly on groundwater aquifers to supply the area’s M&I needs. Be cause this source is <br />nonrenewable, members have been working to identify new supplies of water and opportunities to <br />share resources and infrastructure to reduce dependence on groundwater. The Authority intends <br />to acquire capacity in the East Cherry Creek V alley Water and Sanitation District (ECCV) <br />Northern Supply Pipeline (Pipeline) as a means to convey renewable water supplies, recapture <br />consumable return flows, and increase operational flexibility. The Pipeline is a 48 - inch steel pipe <br />that runs from Barr Lake to ECCV’s service area (located to the east of Cherry Creek Reservoir). <br />The capacity is 47 million gallons/day (mgd). The Pipeline is a regional transmission line and <br />will deliver water both to storage reservoirs and directly to Authority members wh o will then <br />deliver the water through their distribution systems. The Authority is acquiring a total of 31.98 <br />mgd of excess capacity from ECCV. The four members seeking funding from the CWCB will be <br />acquiring 6.55 mgd of this total capacity. Final purch ase and operating agreements are still under <br />negotiation. It is expected that the purchas e will take place in late summer/fall 2009. <br />11. Park Center Water District – Well Rehabilitation <br />Authorization: Severance Tax Fund County: Fremont <br />Water Source: A rkansas Project Yield: 400 acre - feet <br />Terms of Loan: $1,010,000@3.50% for 3 0 yrs. Projec t Type: Well Rehabilitation <br />Park Center Water District (District) is located in Fremont County on the north side of Canon <br />City. The District was formed in 1968 to supply drinking water to area residents. The primary <br />source of this water is a well owned by the Bureau of Land Management (BLM) and leased by <br />the District. The District has leased this well for forty years and has a first right of refusal to <br />renew the l ease when the current contract expires in 2021. In the spring of 2008, the 3,216 foot <br />deep well developed a leak. The BLM and District had a contractor inspect the well and it was <br />determined that leaks existed at 10 feet below the surface and at depths a s great as 2,400 feet. The <br />District decided the most cost effective solution is to re - drill the well. The District has secured <br />stimulus funding from BLM to re - drill the well, and therefore will not be utilizing CWCB loan <br />funds. The loan will be de - autho rized at the November 2009 Board Meeting. <br />12 . Louden Irrigating Canal and Reservoir Company – Reservoir Rehabilitation <br />Authorization: Severance Tax Fund County: Larimer <br />Water Source: Big Thompson River Project Yield: 150 acre - feet <br />Terms of Loan: $ 263,610@3.5% for 3 0 yrs. Projec t Type: Reservoir Rehabilitation <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.