My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 (3)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
9 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 12:39:50 PM
Creation date
8/5/2009 11:19:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/2009
Description
OWCDP Section - Water Efficiency Grant Request - City of Grand Junction,Ute Water Conservancy District, and Clifton Water District - Regional Water Conservation Plan
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.2 Estiinate costs and water savings of conservation options: <br />The Steering Committee and Consultant will estimate the cost of each <br />conservation measure/program and the associated water savings. A benefit/cost <br />analysis will be included. <br />6.3 Compare benefits and costs <br />Consultant will suininarize conservation ineasure costs and water savings, <br />including a net benefit froin all suggested ineasures using Worksheets 6-1 and 6- <br />2. <br />6.4 Define evaluation criteria: <br />The Steering Committee and Consultant will develop criteria used to select the <br />conservation measures/programs for implementation. Key criteria will be cost for <br />iinpleinentation and potential water savings. <br />6.5 Select conservation ineasures and prograins: <br />Consultant will summarize the evaluation of each measure/program based on the <br />evaluation criteria and indicate, with the Steering Committee input, which <br />measures/programs will be implemented. <br />Step 7- Integrate Resources and Modify Forecasts <br />Purpose <br />The activities described under this task will inodify the supply and deinand forecasts to account <br />for water savings from the selected conservation measures and programs. The benefits of <br />conservation as well as revenue effects will also be addressed. <br />Approach <br />7.1 Revise demand forecast: <br />Consultant will revise the deinand forecast prepared in Step 2 to account for the <br />water savings of the measures/programs from Step 6. <br />7.2 Identify project-specific savings: <br />The Steering Coininittee and Consultant will deterinine the effect of water savings <br />from conservation on the timing and capacity of facility improvement proj ects <br />and quantify savings. <br />7.3 Revise supply-capacity forecast: <br />Consultant will revise the supply capacity forecast based on findings from 7.2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.