Laserfiche WebLink
6.2 Estiinate costs and water savings of conservation options: <br />The Steering Committee and Consultant will estimate the cost of each <br />conservation measure/program and the associated water savings. A benefit/cost <br />analysis will be included. <br />6.3 Compare benefits and costs <br />Consultant will suininarize conservation ineasure costs and water savings, <br />including a net benefit froin all suggested ineasures using Worksheets 6-1 and 6- <br />2. <br />6.4 Define evaluation criteria: <br />The Steering Committee and Consultant will develop criteria used to select the <br />conservation measures/programs for implementation. Key criteria will be cost for <br />iinpleinentation and potential water savings. <br />6.5 Select conservation ineasures and prograins: <br />Consultant will summarize the evaluation of each measure/program based on the <br />evaluation criteria and indicate, with the Steering Committee input, which <br />measures/programs will be implemented. <br />Step 7- Integrate Resources and Modify Forecasts <br />Purpose <br />The activities described under this task will inodify the supply and deinand forecasts to account <br />for water savings from the selected conservation measures and programs. The benefits of <br />conservation as well as revenue effects will also be addressed. <br />Approach <br />7.1 Revise demand forecast: <br />Consultant will revise the deinand forecast prepared in Step 2 to account for the <br />water savings of the measures/programs from Step 6. <br />7.2 Identify project-specific savings: <br />The Steering Coininittee and Consultant will deterinine the effect of water savings <br />from conservation on the timing and capacity of facility improvement proj ects <br />and quantify savings. <br />7.3 Revise supply-capacity forecast: <br />Consultant will revise the supply capacity forecast based on findings from 7.2. <br />