My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 (3)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
9 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 12:39:50 PM
Creation date
8/5/2009 11:19:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/2009
Description
OWCDP Section - Water Efficiency Grant Request - City of Grand Junction,Ute Water Conservancy District, and Clifton Water District - Regional Water Conservation Plan
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.3 Prepare demand forecast: <br />Consultant will estiinate future water deinand by custoiner category according to <br />the selected forecasting inethod. <br />Step 3- Profile Proposed Facilities <br />Purpose <br />The activities described under this task will identify and describe planned improvements based <br />on the results from step two and estimate the associated costs. <br />Approach <br />3.1 Estimate supply costs based on the demand forecast: <br />Consultant will work with Steering Committee to prepare incremental and total <br />costs for water supplies that are appropriate for the demand forecast. <br />3.2 Identify and describe anticipated capital facility iinproveinents and additions: <br />Consultant will use information from each of the Entities to summarize proj ect <br />capital improvements. <br />3.3 Estimate total, annual and unit cost of the improvements: <br />Consultant will summarize cost estimates of improvements. <br />3.4 Develop a water supply capacity forecast: <br />Consultant will coinbine inforination gathered in this step to provide a <br />summarized supply capacity forecast. <br />Step 4- Identify Conservation Goals <br />Purpose <br />The activities described under this task will identify conservation goals for the Entities. <br />Approach <br />4.1 Develop water conservation goals <br />Consultant will develop water conservation goals in collaboration with the <br />Steering Committee. Areas for water conservation will be identified by the <br />Steering Committee based on results from Steps 2 and 3. A specific water- <br />savings target, as well as how the savings will be measured, will be identified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.