My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150297 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150297 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:13:22 PM
Creation date
8/5/2009 10:58:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150297
Contractor Name
Farmers Reservoir and Irrigation Company
Contract Type
Loan
Water District
0
County
Adams
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT PURPOSE <br />The intent of this project is to construct enlarge the existing spillway, which is located near <br />the dam's right abutment. Improvements will lower the crest elevation of the spillway by <br />1.5 feet and increase the width of the spillway from 350 feet to 585.7 feet. With these <br />improvements the dam will be able to contain the peak reservoir volume associated with <br />75% of the Probable Maximum Flood (PMF) as required. The new spillway will have the <br />ability to pass a peak flow of 22,888 cubic feet per second (cfs). During the design event the <br />maximum water level in the reservoir would be limited to elevation 4,809.58, which is 0.02 <br />feet below the crest of the dam. <br />Safely conveying the design flow requires a significant amount of earthworks both upstream <br />and downstream from the spillway crest. Upstream areas will be excavated to create an <br />efficient flow path from the reservoir to the spillway crest. Downstream of the spillway <br />crest grading is required to widen the existing channel to prevent a backwater condition. <br />Channel armoring will be added at key locations downstream of the spillway to minimize <br />erosion and prevent headcutting that could threaten the dam. <br />Minor work on the dam crest is included in this project. Currently several low spots exists. <br />Fill will be placed in these locations to raise the minimum elevation of the dam crest above <br />the water surface elevation that results from the PMF. <br />Planned improvements are intended to satisfy requirements of the SEO, provide for the <br />continued safe operations of the dam and prevent storage limitations from being placed on <br />the reservoir. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.