PROJECT PURPOSE <br />The purpose for this project is to replace the existing upstream outlet gates with new gates. <br />The existing gates have reached their useful life. As originally designed and installed, the <br />upstream gates were intended to be used to regulate flows out of the reservoir. Wear on <br />the system has degraded the operations of the upstream gates so that they can no Ionger <br />be used to regulate flows out of the dam as intended. In their current condition these gates <br />can only be set as open or closed and cannot control flows. As a result FRICO has been <br />forced to operate flows using the downstream guard gates. Replacing the upstream gates <br />will allow FRICO to operate the reservoir from the upstream end of the gate, eliminate <br />pressurized flows in the outlet works and provide the desired safety of fully operational <br />upstream and downstream gates. Remote operational capabilities will be added to the new <br />gates allowing FRICO to open and close the gates from their office if required in an <br />emergency situation. <br />The need to complete this work extends beyond the operational limitations noted above. <br />FRICO has had engineer's inspections of the outlet works following the monitoring criteria <br />of the SEO. During the past several years the upstream gates have not been able to fully <br />seal when closed and the section of steel conduit connecting the gates to the main outlet <br />conduit has deteriorated. A small leak exists through an old fitting (likely a grout nipple) in <br />the western of the two outlet pipes. Deterioration of the steel in this area makes repairs of <br />this area difficult. <br />7 <br />