My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150297 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150297 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:13:22 PM
Creation date
8/5/2009 10:58:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150297
Contractor Name
Farmers Reservoir and Irrigation Company
Contract Type
Loan
Water District
0
County
Adams
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT PURPOSE <br />The purpose for this project is to replace the existing upstream outlet gates with new gates. <br />The existing gates have reached their useful life. As originally designed and installed, the <br />upstream gates were intended to be used to regulate flows out of the reservoir. Wear on <br />the system has degraded the operations of the upstream gates so that they can no Ionger <br />be used to regulate flows out of the dam as intended. In their current condition these gates <br />can only be set as open or closed and cannot control flows. As a result FRICO has been <br />forced to operate flows using the downstream guard gates. Replacing the upstream gates <br />will allow FRICO to operate the reservoir from the upstream end of the gate, eliminate <br />pressurized flows in the outlet works and provide the desired safety of fully operational <br />upstream and downstream gates. Remote operational capabilities will be added to the new <br />gates allowing FRICO to open and close the gates from their office if required in an <br />emergency situation. <br />The need to complete this work extends beyond the operational limitations noted above. <br />FRICO has had engineer's inspections of the outlet works following the monitoring criteria <br />of the SEO. During the past several years the upstream gates have not been able to fully <br />seal when closed and the section of steel conduit connecting the gates to the main outlet <br />conduit has deteriorated. A small leak exists through an old fitting (likely a grout nipple) in <br />the western of the two outlet pipes. Deterioration of the steel in this area makes repairs of <br />this area difficult. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.