My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150297 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150297 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2011 3:13:22 PM
Creation date
8/5/2009 10:58:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150297
Contractor Name
Farmers Reservoir and Irrigation Company
Contract Type
Loan
Water District
0
County
Adams
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Both dams are categorized as Class I, High Hazard dams and as such are under the <br />jurisdiction of the State Engineer's Office (SEO). <br />This grant application requests funding for three projects including work at both Milton <br />Reservoir and Barr Lake: <br />• Milton Outlet Works - Remove and replace the existing outlet gate structure and <br />repair a portion of the piped outlet works through the dam <br />• Milton Spillway - Enlarge the existing emergency spillway <br />• Barr Spillway - Enlarge the existing spillway and raise the perimeter dike <br />Each of the three projects are described in detail below. Descriptions include alternatives <br />considered, cost estimates, a preferred alternative and potential impacts. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.