My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Prehearing Statement of the Town of Silverton
CWCB
>
Water Supply Protection
>
DayForward
>
3001-4000
>
Prehearing Statement of the Town of Silverton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:41:25 PM
Creation date
7/27/2009 10:35:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8230.51A1a
Description
Applicant's Prehearing Statements: Legal Documents
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/6/2005
Author
David W. Robbins, Mark J. Wagner
Title
Prehearing Statement of the Town of Silverton
Water Supply Pro - Doc Type
Court Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mark Richards, P.E. <br />• WaterQuality Modeler. Constructed QUAL2E water quality model to analyze <br />the effectiveness of various water quality unprovement technique along a <br />100-mile long section of the Snake River to reduce phosphorus and <br />chlorophyll concentrations in the river. Coordinated with numerous <br />agencies such as Idaho and Oregon DEQs, EPA, USGS, Idaho Powex <br />Company, Boise City and six wastewater treatment plants along the reach to <br />gather the required data to construct and operate the model. <br />Watershed Management, City of Lincoln, Nebraska <br />WaterQuality Modeler. Assisted in the development of a detailed predictive <br />sunulation ammonia model to provide a scientific basis for the development <br />of site-specific ammonia criteria and appxopriate NPDES pexmit limits. <br />Watershed Modeling, Cherry Creek Board Water Quality Authority, Colorado <br />WaterQuality Modeler. Developed watershed based predictive model for <br />phosphorus loading to assist in the determination of a Tota1 Maxunum <br />Annual Load to Chexry Creek Reservoir. Assisted in the selection and <br />screening of pollution reducing facilities and best management practices in <br />the watershed. <br />Dissolved Oxygen Modeling, City of EI Paso, Texas <br />WaterQuality Modeler. Examined instream water quality impacts fxom the <br />dischaxge from wastewater treatment plant on two receiving waters to <br />• support NPDES permit renewal. Explored the potential for water quality <br />standard violations undex various operational and flow conditions. <br />Wastewater Treatment Plan Study, Boulder, Colorado . <br />HydraulicModeler. Performed hydxaulic analyses to evaluate the present <br />opexations and futuxe design alternatives of the Bouldex, Coloxado <br />Wastewater Treatment Plant. <br />Main Pumping Station Ely Wastewater Treatment Plant, Ely, Minnesota, Public <br />Utilities Commission <br />HydraulicModeler. Performed the hydxaulic analysis to assist in the design of <br />the Ely, Mimiesota Wastewater Txeatment Plant. Coordinated the selection <br />of the pumps, compressars, blowexs, air diffuser system and other <br />equipment for the plant. <br />Grand Rapids, Michigan <br />HydraulicModeler. Perfortned hydraulic analyses to evaluate the present <br />operations and future design alternatives of the Grand Rapids, Michigan <br />Wastewater Txeatment Plant. <br />• <br />m:4esumes\Richards Mark.doc
The URL can be used to link to this page
Your browser does not support the video tag.