My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cook Evaluation of Wyoming's New Depletions Plan
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
Cook Evaluation of Wyoming's New Depletions Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:40:48 PM
Creation date
7/16/2009 11:43:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
8/22/2005
Author
Cook
Title
Cook Evaluation of Wyoming's New Depletions Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment No. I <br />Wyoming's Depletions Plan <br />Use of Under Runs to Offset Overruns <br />And <br />Tracking of New Depletions, Overruns, Under Runs and Offsets <br />Trackin2 of Depletions Caused bv New Water Related Activities and Offsets for <br />those Depletions <br />For purposes of tracking the depletions caused by new water related activities, normal <br />conveyance losses only will be used. For subbasins 1 and 2, any such depletions will be <br />routed to Whalen or to the point upstream of Whalen where such depletions will be <br />mitigated. For subbasins 3, 4, 5, and 6, any such depletions will be routed to the <br />location(s) at the state line where the effects of such depletions will occur. <br />Water used to offset for depletions caused by new water related activities will be tracked <br />using normal conveyance losses from the point of the offset to the location where the <br />offset is required (at or above Whalen for subbasin 1 or 2 offsets and at or above the <br />location(s) on the state line where the effects of the depletions will occur for subbasins 3, <br />4, 5, and 6). <br />Use of Under Runs to Offset Overruns, Baseline 1 and Routin2, When Apulicable <br />Subbasin 1: <br />1. An under run from this subbasin may be used only to offset a Baseline 1, subbasin <br />2 overrun. <br />2. The only under run that may be used to offset an overrun from this subbasin is an <br />under run from Baseline 1, subbasin 2. <br />3. Normal conveyance losses from Pathfinder Dam to Guernsey Dam will be used to <br />route overruns and under runs from this subbasin to subbasin 2. <br />Subbasin 2: <br />1. An under run from this subbasin may be used only to offset a Baseline 1, subbasin <br />1 overrun. <br />2. The only under run that may be used to offset an overrun from this subbasin is an <br />under run from Baseline 1, subbasin 1. <br />3. Neither overruns nor under runs from this subbasin need to be routed.
The URL can be used to link to this page
Your browser does not support the video tag.