Laserfiche WebLink
? <br />e. Examine the proposed monitoring and research identified in the IMRP to <br />determine if the proposed priority hypotheses are addressed by the existing <br />protocols. <br />f. Modify the list of protocols to insure that all priority hypotheses are <br />addressed and eliminate unnecessary protocols and reallocate budgets. <br />7. Incorporate workshop products into the revised draft AMP and circulate to the <br />GC at least two weeks in advance of a workshop with the GC to be held in <br />October 2005. It is anticipated that this workshop will last for two days. The <br />purpose of the workshop will be to gather verbal comments and <br />recommendations on the revised AMP. If schedules allow, all five AM experts <br />should plan to attend the workshop with the GC. Written comments will be <br />requested within two weeks of the end of the workshop. The AM Workgroup <br />will present details on the AMP including CEMs, priority hypotheses, <br />8. The ED's office will revise and finalize the AMP for distribution in December <br />2005.