Laserfiche WebLink
CWCB (Sec. 10) Continue to provide planning and engineering studies, Statewide $250,000 <br />Continuation of the including implementation measures, to address technical <br />Watershed Restoration needs for watershed restoration and flood mitigation <br />Pro am projects throughout the State. <br />CWCB (Sec.ll) Continue to provide floodplain management technical Statewide $125,000 <br />Continuation of the services assisting local governments with high priority <br />Floodplain Technical flood control study, planning, engineering and <br />Services preconstruction activities. <br />CWCB (Sec.12) Refresh fund created to respond to flood events by Statewide $300,000 <br />Restoration of Flood documentation, forecasting, post flood mapping and flood <br />Response Fund Balance ~tigation. <br />CWCB (Sec.13) Continue the operation of a consolidated water resources Statewide $550,000 <br />Water Resource information center and to collaborate with C.S.U. by <br /> combining document management systems to provide <br />Information Center and statewide on-line access to imaged water-related <br />Data Harvesting Initiative documents including publications, maps, audio files, <br />. reports, water right decrees, historical documents and <br /> collections, flood insurance studies and other water info. <br />CWCB (Sec.14) Participate with the U.S. Geological Survey in the Statewide $50,000 <br />Modflow Enhancement for ~hancement of mudflow, a USGS groundwater model, to <br />Colorado Decision Support make groundwater modeling process more efficient and <br />S stems river decision support systems more accurate and reliable. <br />CWCB (Sec.15) Continue the development of the South Platte decision South Platte $150,000 <br />Continuation of the South support system. Basin <br />Platte Decision Support <br />System <br />CWCB (Sec.16) Continue the model development phase of the Colorado Colorado $1,000,000 <br />Continuation of the water needs and alternatives analysis, authorized in SB 07- g~ver Basin <br />Colorado River Water 122. Continue to work in full consultation with, and the <br />Availability Study - Phase active involvement of , the basin roundtables and continue <br />~ to consider current and potential future in-basin <br /> consum tive and non-consurn tive needs. <br />CWCB (Sec.l'~ Provide technical and financial assistance in addressing the Arkansas $250,000 <br />Arkansas River Surface effects of increasing agricultural water use efficiency in River Basin <br />Water Rules Technical and the Arkansas river basin, as established by the Colorado <br />Financial Assistance State engineer's promulgated rules, and formulate and <br /> implement cost-effective means to comply with the rules <br /> and specific measures to prevent potential compact <br /> violations. <br />CWCB (Sec.18) Restore the unencumbered balance in the Litigation Fund Statewide $2,200,000 <br />Restoration of Litigation to $4,000,000. The Litigation Fund is used to fund the <br />Fund Cash Balance Attorney General's Office for the purpose of engaging in <br /> litigation to defend and protect Colorado's allocations of <br /> water in interstate streams and rivers. <br />CWCB (Sec.19) Create a Fund in order to work with in-basin stakeholders Statewide $400,000 <br />Wild and Scenic Rivers to explore alternatives to wild and scenic designations, and <br />Fund - Creation. to explore alternatives that would fall within the wild and <br /> scenic designation process. The fund would be <br /> continuously appropriated to an unencumbered balance of <br /> $400,000 annuall . <br /> Total 8, 780, D00 <br />