My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Year 2002 EA AOP with Membership List
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
Water Year 2002 EA AOP with Membership List
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:41 PM
Creation date
6/25/2009 12:59:22 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.300
Description
EAC/RCC
State
CO
Basin
South Platte
Water Division
1
Date
2/11/2002
Author
Environmental Account Manager
Title
Water Year 2002 EA AOP with Membership List
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 4. Shortages Based on Districts' Predicted WY 2002 Operations (Dry Year <br />Prediction) bv Shortage Period (kafl <br /> Average IFR Dry IFR <br />Shortage <br />Period # of <br />Davs Shortaize <br />Per Dav Total <br />Shortaee Shortaize <br />Per Day Total <br />Shortaee <br />10-1 to 10-31 31 2.58 79..98 1.59 - 49:29 <br />11-1 to 11-15 15 2.08 31.20 1.09 4435 : <br />11-16 to 11-30 15 0.50 7.50 0 0 <br />12-01 to 12-31 31 0.10 3.10 0 0 <br />1-01 to 1-31 31 0.20 6.20 0 0 <br />2-01 to 12-15 15 0.99 14.85 0 0 <br />2-16 to 2-28 13 4.07 52.91 1.88 .?.24.44 y. <br /> <br />3-01 to 3-15 <br />15 <br />3.37 <br />50.55 <br />1.19 ? <br />:17:85: <br />3-16 to 3-22 7 0.30 2.10 0 0 <br />3-23 to 3-31 9 1.49 13.41 0.10. ';".• ??'r? ;;'????,Q;9U'; <br />4-01 to 4-30 30 2.28 68.40 0.89 ,. <br />26:70 <br />: <br />5-01 to 5-10 10 2.98 29.80 1.59 '`,15;9Q <br />5-11 .to 5-31 21 0.60 12.60 0 0 <br />6-01 to 6-30 30 1.59 47.70 ' 0.79 < <br />23;7U, <br /> <br />7-01 to 7-31 <br />31 <br />1.29 <br />39.99 <br />0.50 ,. .. , 4 <br /> <br />8-01 to 8-31 <br />31 <br />1.59 <br />49.29 <br />0.79 e::W' -?•R;C. FcS,,i:?, yi ? <br /> <br />9-01 to 9-15 <br />15 <br />1.79 <br />26.85 <br />0.99. - .*,,7 <br />9-16 to 9-30 15 1.39 20.85 0.60 9.Q0>. <br />Total 365 557.28 238.97 <br />Water Year 2002 Environmental Account Release Priorities <br />Numerous hydrologic and biologic conditions must be considered throughout the year in <br />determining EA releases. The duration and quantity of water to be released will depend on <br />historic and existing conditions, Service target flow recommendations, EA volume, and release <br />priorities identified in this AOP. Based on predicted "dry" conditions again for the 2002 water <br />year and projected flows for the central Platte; the Service identified priorities for each seasonal <br />period in Table 5(page 10-12). <br />Water Year 2002 EA AOP 6 January 7, 2002
The URL can be used to link to this page
Your browser does not support the video tag.