My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Governance Committee Meeting Minutes
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
Governance Committee Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:17 PM
Creation date
6/22/2009 2:21:43 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.750
Description
Governance Committee
State
CO
Basin
South Platte
Water Division
1
Author
PRRIP
Title
Governance Committee Meeting Minutes
Water Supply Pro - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ti <br />? r <br />Task WP-1- Modification of Contract with David Smith <br />Dale Strickland reported that the FC recommended that the contract with David Smith be <br />modified to reflect an additional $10,000 in Program funds; that the contract be with Jerry Kenny <br />instead of Dale Strickland; and that the contract be modified to secure David's services on choke <br />point issues such as Nebraska boundary law and easements. Mike Purcell stated that David <br />Smith would also provide a presentation at the October GC meeting about boundary issues. The <br />GC approved. <br />Task WC-3 - Water Surface Elevation Pilot Study <br />Jerry Kenny reported that the Program needs information about water surface elevation where <br />whooping cranes are sighted using the river. The TAC and FC recommend the BOR do a pilot <br />analysis of 10 sites using three different methods. Jerry Kenny reported that expediency and the <br />need to have this data quickly led to sole source on this issue. Clayton Derby reported that the <br />$18,313 for this pilot study would be moved from Task S-3 (Recruit/Hire ED) in the 2007 <br />budget because the ED is in place and those funds are no longer needed for that line item. T'he <br />GC approved. <br />Task 5-1- Extension of Agreement with WEST, Inc. <br />Jerry Kenny reported that the existing agreement with WEST, Inc. ends on September 30. Jerry <br />Kenny and Dale Strickland are working on a contract for access to Dale and staff and for <br />providing a mechanism for completion of the whooping crane analysis. Dale Strickland said <br />there are adequate funds available in the existing budget to provide for a transition contract. <br />Mike Purcell said that there is no change in the budget and WEST, Inc. will essentially be a sub- <br />contractor of Jerry Kenny and the ED Office. The GC approved. <br />Task LP-2 - Cottonwood Ranch Agreement <br />Jerry Kenny reported on the agreement prepared by NPPD prepared in response to direction from <br />the Apri12007 GC meeting. The agreement with NPPD includes $75,000 for habitat <br />maintenance activities at Cottonwood Ranch in 2007 and $200,000 for habitat enhancement at <br />Cottonwood Ranch in 2007. Actual costs would be paid within one year of federal authorization <br />of the Program. Brian Barels will provide the GC with an invoice for all pre-2007 Cottonwood <br />Ranch costs at the October GC meeting. The GC approved a 2007 budget of $275,000. <br />Tasks PS-1 and PS-2 - Pallid Sturgeon Information Review and Stage Change Study <br />Chad Smith reported on a proposal to modify Program document language relative to timing of <br />the lower Platte stage change study and secondly, his intention to complete the pallid sturgeon <br />information review/summary (Task PS-1) as ED Office staff. Ann Bleed said she was concerned <br />about the language change being a major change and that it seemed the Program was moving <br />away from the stage change study as a hydrology study and into broader work on the pallid <br />sturgeon. Mark Butler provided a brief summary of the FWS position on pallid sturgeon and <br />read from the Program document and study description in the Adaptive Management Plan which <br />states that the study is to "Identify the physical effects of subtly different rates of flow (stage and <br />associated elements) over time on connection, construction, maintenance, and evolution of pallid <br />sturgeon habitat components". Don Kraus and Mike Purcell said they were also concerned about <br />the proposed change. Mike Purcell recommended tabling the issue until the October GC meeting <br />This document is a draft based on one person's notes of the meeting. The official meeting minutes may be different <br />if corrections are made by the Govemance Committee before approval. Page 7 of 8
The URL can be used to link to this page
Your browser does not support the video tag.