My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meeting Lower South Platte Conservancy District
CWCB
>
Water Supply Protection
>
DayForward
>
2001-3000
>
Meeting Lower South Platte Conservancy District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:39:00 PM
Creation date
6/22/2009 9:01:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.800
Description
Lower South Platte Water Conservancy District
State
CO
Basin
South Platte
Water Division
1
Date
8/1/2005
Author
Lower South Platte Water Conservancy District
Title
Meeting Lower South Platte Conservancy District
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
General Manager Frank introduced the District's new full-time technician, Joey Willeke to the <br />Board. The meeting was then called to order by President Stromberger who introduced the <br />guests. <br />***??***?**********?* <br />APPROVAL OF THE MAY 10, 20051dIINU'I'ES: <br />Director Crandall made the motion to approve the Mav 10, 2005 Minutes as submitted. Director <br />Treadwav seconded. Motion carried. Director Coyne abstained. <br />FINANCE REPOltT: <br />Director Powers made the motion to approve pavment of District checks #9129 through 9174 and <br />Julesburg Recharge check #283. Director Treadwav seconded. Motion carried. <br />RIVER MONITORING REPORT: <br />Division I, Water Court Resume ': <br />No statements of opposition will be fled from the April, 2005 Resume'. <br />- - JZClesbur_g_Recharge Project.: - _ -- _ -- . - _ - - -_ - -- --_-? -- - . _- _N- -- - <br />Director Haynes noted that both t4e Peterson and Liddle Ditches have been able to divert Nater <br />for recharge. <br />Director Haynes stated that the Julesburg well users group is still working on their plan to form <br />their own well users group. <br />I,EGAI. ItEPOlZ7': <br />Included in Counsel Lawrence's report were the following: <br />Counsel Lawrence reviewed Central's Decree with the Directors. <br />Augmentation Plan, 02CW320 and 2005 SWSP - Counsel noted that the 2005 <br />Substitute Water Supply Plan was approved. Regarding the District's <br />Augmentation Plan, Counsel Lawrence stated that an engineering report needs to <br />be done before any further work can be done by his office. Manager Frank <br />recommended the Julesburg well users group hire their own engineer to do -this <br />work. <br />-2-
The URL can be used to link to this page
Your browser does not support the video tag.