My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meeting Lower South Platte Water Conservancy District (3)
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
Meeting Lower South Platte Water Conservancy District (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:57 PM
Creation date
6/19/2009 4:26:50 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.800
Description
Lower South Platte Conservancy District
State
CO
Basin
South Platte
Water Division
1
Date
10/2/2006
Author
Lower South Platte Water Conservancy District
Title
Meeting Lower South Platte Water Conservancy District
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The meeting was called to order by President Stromberger who introduced the guests. <br /> <br />APPROVAL OF THE 2005 AUDI'I': <br />Lauer, Szabo, & Associates were unable to present the audit report at today's Board meeting due <br />to a scheduling conflict. The District did receive approval from the State for an extension until <br />September 30, 2006 to submit the audit. <br />APPROVAL OF THE JULY 11, 2006 MINUTES: <br />Director Covne made the motion to a,pprove the Julv 11 2006 Minutes as submitted. Director <br />Treadwav seconded. Motion carried. <br />FINANCE REPORT: <br />Director Powers made the motion to approve pavment of District checks # 9767 throu hg 9801 <br />and Julesbura Rechar2e Project checks 312 throu hg 314• Director Covne seconded. Motion <br />? _.. -- - - -- - ---_ - - ---- -- = =----? - <br />carried. - <br />RIVER MONITORING REPORT: <br />Division I, Water Court Resume': <br />No statements of opposition will be filed from the June, 2006 Water Court Resume'. <br />Julesburg Recharge Project: <br />The Julesburg Well Users subcommittee met with the Board during today's work session to <br />review the engineering report from Nation Engineering for the Water Activity Enterprise's <br />augmenta.tion plan. The engineering report must be submitted to Water Court by August 21St <br />Counsel Lawrence will be submitting a draft decree this month for review. <br />Manager Frank noted that the Beavers augmentation well was turned on today. <br />-2-
The URL can be used to link to this page
Your browser does not support the video tag.