Laserfiche WebLink
Financia! Analysis <br />The North Ste~iing Irrigation District is applying for a loan from the CWCB in maximum amourrt <br />of $1,084,005 to accommodate 90% of the estimated $1,204,450 total cost of the project. The <br />North Sterling Irrigation District will cover any costs that exceed the estimated project cost. <br />The North Sterling Irrigation District is requesting a 20-year loan from the CWCB. The current <br />ownership of the North Steriing Imgation District is 100.0% agricultural resulting in a lending rate <br />of 2.25%. At this rate annual payments would be $67,904. To this would be added $6,790 per <br />year for the first 10 years to fund the emergency reserve acxount. This would make the NSID <br />responsible for a total annual cost of $74,694. The above figures are included in the summary <br />of the financial aspects of the project presented in Table 2. NSID has sufficient cash in resenre <br />to pay for the 10% of the project cost not covered by the CWCB loan. NSID also has $109,000 <br />contingent expense in the 2009 budget for any unforeseen costs. Taking this into consideration <br />no increase in levy is necessary at this time, however the 2010 budget will most likely require a <br />$2.00 increase in the district levy. The cuITent district levy is $12.00 per acre or $7.69lac-ft <br />based on the average delivery of 1.56 ac~ feet per acre. If the increase of $2.00 per district <br />acre is enacted, this will result in a district levy of $14.00 or $8.97/ac-ft. <br />Table 2. Financial Summary <br />Pro'ect Cost $1,204,450 <br />Loan Amount 90% of Pro'ect Cost $1,084,005 <br />CWCB Loan Pa ment Amount, includin 10% loan rese-ve $74,694 <br />Number of Landowners 144 <br />Number of Acres in the District 40,916.94 <br />Current Assessment er acre $12.00 <br />Future Assessment r acre $14.00 <br />Annual Project Cost per acre-foot <br />Avera e annual delive : 1.56 acre-feet/acre $1.17 <br />Since 90% of the funding for the project is from the CWCB and the NSID has sufficient <br />reserves, no other debt service is required for this project. The annual end of year financial <br />statements for the years 2007 and 2008 for fhe North Sterfing Irrigation District atong with t~e <br />2009 budget is provided in Appendix E. <br />Credit worthiness <br />NS1D has no existing debt. Table 3 shows the Financial Ratios for the NSID and indicates <br />average to strong ability to repay with the project in place. <br />North Sterling ~rigation District Page 11 of 13 <br />Dam Crest and Spillway Improvemern Feasibility Study <br />March 1, 2009 <br />