My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-026 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
CT2015-026 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:56:30 AM
Creation date
6/18/2009 8:43:31 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-026
C150291
Contractor Name
Riverside Reservoir and Land Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Riverside Reservoir and Land Company Agenda Item 17g <br />May 12, 2009 (UPDATFD May 22, 2009) <br />Page 3 of 6 <br />Riverside Irrigation District (District) owns 8,027 shares (2,006.75 rights, 80%) of the Company <br />and is therefore the majority owner. Four of the five board members of the Company also serve on <br />the District board. The remaining rights are owned by other ditch companies and private <br />individuals. <br />Assessments may be raised to cover debt service with approval of the stockholders. The Company <br />may put a lien upon shares of stock and stop water delivery if assessments are not paid. The <br />Company shareholders passed a resolution in February 2009 authorizing the board of directors to <br />obtain a loan from the CWCB for the spillway. The board subsequently passed a resolution in <br />March 2009 authorizing the Proj ect. <br />Water Rights <br />Table 1. Water Rights <br />Water Right Appropriation Adjudication Amount Use <br /> Date Date <br />Reservoir Storage 4/1/1902 1/15/1914 16,070 AF Irrigation <br />Reservoir Storage 8/1/1907 1/15/1914 41,437 AF Irrigation <br />Reservoir Storage 10/25/1910 1/15/1914 Enough to fill <br />to GH 34' ~gation <br />Reservoir Storage 12/31/1929 6/8/1965 56,325 AF Irrigation <br />(Refill) <br />Project Description <br />The purpose of this Project is to equip the Reservoir with an emergency spillway that is required <br />by the SEO. The Project will enhance the safety of the Reservoir by allowing the safe routing of <br />the inflow design flood without the overtopping of the dam embankment. <br />Three alternatives were considered prior to reaching the current spillway design. The <br />alternatives were: <br />1. The no-action alternative; <br />2. Construct a concrete spillway near station 57+OOE; <br />3. Construct a concrete spillway at station 9+OOE or 2+OOE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.