My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-026 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
CT2015-026 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 9:56:30 AM
Creation date
6/18/2009 8:43:31 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-026
C150291
Contractor Name
Riverside Reservoir and Land Company
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Riverside Reservoir and Land Company Agenda Item 17g <br />May 12, 2009 (UPDATED May 22, 2009) <br />Page 2 of 6 <br />Riverside Reservoir was constructed in stages beginning in 1900. The original reservoir was <br />constructed by the South Platte Land, Reservoir and Irrigation Company and was known as <br />Sanborn Draw Reservoir. Initially an outlet structure was constructed at the reservoir site and <br />minor fill dams were built to form Sanborn Draw Reservoir, which held approximately 16,000 <br />acre-feet (AF). It first received water in about 1902. Shortly thereafter, the Riverside Reservoir <br />and Land Company was formed and purchased Sanborn Draw Reservoir and the associated inlet <br />canal. Riverside Irrigation District was formed at that time to purchase 1,200 of the rights in the <br />Riverside Reservoir and Land Company. Based upon the Riverside Irrigation District contract, the <br />Company enlarged Sanborn Draw Reservoir to the present capacity of approximately 64,000 AF <br />and changed its name to Riverside Reservoir. <br />The Reservoir has been classified by the Colorado Division of Water Resources as a Large Size, <br />High Hazard structure. This classification denotes that failure of the dam would cause extensive <br />property damage and probable loss of human life. The Reservoir currently is not equipped with an <br />emergency spillway, which is required by the DWR's Rules and Regulations for Dam Safety and <br />Dam Construction. Construction of a spillway on the dam will reduce the risk of dam failure by <br />over-topping during an extreme flood event, thereby enhancing the safety of downstream residents <br />and property. <br />The SEO has issued a nominal storage restriction on the Reservoir of 0.05-feet (200 AF of storage <br />loss) and has required the construction of a spillway on the dam. For this reason, the Company is <br />undertaking this proj ect to enhance the safety of the Reservoir. <br />Feasibility Studies <br />The Loan Feasibility Study titled "Feasibility of the Construction of the Riverside Reservoir <br />Emergency Spillway, March 2009" was prepared by James Ferentchak, P.E., of W.W. Wheeler <br />and Associates, Inc. The study was prepared in accordance with the CWCB guidelines and <br />includes an alternative analysis, engineering design and cost estimates. <br />Riverside Reservoir and Land Company <br />The Company is a non-profit corporation formed under the laws of the State of Colorado. It was <br />formed in April 1902 to construct and operate Riverside Reservoir and the Riverside Canal for <br />the benefit of the shareholders. The Company diverts approximately 105,000 AF annually and <br />releases roughly 39,000 AF of water from the Reservoir. <br />There are 10,020 shares of stock in the Company. For practical purposes of levying assessments <br />and allotting water, the Company uses rights. One right in the Company represents four shares of <br />stock. There are 2,505 rights in total. <br />The Company is managed by a five - member board of directors elected on an annual basis. The <br />Company officers include a president and vice president elected by the board of directors. The <br />secretary treasurer is hired by the board. The board also retains a superintendent to conduct the <br />normal day-to-day operations of the Company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.