My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWSI Implementation Update
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
SWSI Implementation Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:38:32 PM
Creation date
6/15/2009 2:21:05 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.250
Description
Water Issues
State
CO
Basin
South Platte
Water Division
1
Date
3/26/2003
Author
Rod Kuharich, Rick Brown
Title
SWSI Implementation Update
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ti <br />? <br />-4- <br />1.3 Basin Advisor Coordination <br />Purpose <br />Consultant will establish and manage basin advisors in each of the state's eight river basins to assist <br />in the implementation of the project. <br />1.4 CWCB Steering Committee Meetings <br />Purpose <br />The CWCB steering committee will serve as the primary technical team associated with the project <br />and as the primary policy-level advisory group. <br />1.5 Statewide Advisory Group Meetings <br />Purpose <br />The purpose of the Statewide Advisory group meetings is to build consensus on a statewide <br />perspective regarding issues of concern associated with the project. This group will review and <br />provide information regarding individual basins, and help guide the development of water supply <br />and demand objectives, and strategies for achieving those objectives. <br />1.6 Basin Roundtable Meetings <br />Purpose <br />The prunary purpose of the basin roundtable meetings is identifying alternatives and projects in <br />each basin that will function to satisfy the demands in that respective basin utilizing the supply in <br />that basin as described in Task 10. The basin roundtable meetings will be open to the public and <br />there will be time for public input, however, the majority of public comment will be received <br />during the Basin Public meetings as described in Task 1.7. <br />1.7 Basin Public Meetings <br />Purpose <br />To provide meaningful public comment, involvement, and buy-in on the in-basin and statewide <br />issues and potential solutions. <br />1.8 CWCB Board Meetings <br />Purpose <br />To report to the CWCB board every 2 months. <br />Task 2- Data Collection & Review <br />Purpose <br />To obtain and review available studies within the state that relate to current water supply demands, <br />water availability, and possible supply options. This may include studies that are currently in <br />progress. <br />Flood Protection • Water Project Plaiuting and Financing • Stream and Lake Protection <br />Water Supply Protection • Conservation Plannulg
The URL can be used to link to this page
Your browser does not support the video tag.