My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ISAC: Guidance Memo for Establishment of Selection Panel
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
ISAC: Guidance Memo for Establishment of Selection Panel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:53 PM
Creation date
6/8/2009 11:52:11 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.750
Description
Independant Science Advisory Committee
State
CO
Basin
South Platte
Water Division
1
Author
SPWRAP
Title
ISAC: Guidance Memo for Establishment of Selection Panel
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5) In conjunction with the ED a.nd staff, the Selection Panel will develop a pool of nominees, <br />evaluate the credentials of those nominees, and recommend qualified candidates for <br />appointment. This pool of candidates should include indentified azeas of needed expertise, <br />meet the membership criteria for the ISAC, and be large enough to last through several <br />rounds of appointments during the First Increment. T'he Selection Panel will make its <br />recommendations to the GC in writing. <br />6) The GC retains ultimate authority to approve the recommendations of the Selection Panel <br />and will have final say in the composition of the ISAC. <br />PROPOSED SCHEDULE <br />2007 <br />October 26 GC appoints Selection Panel <br />November 16 ED/Staff present Selection Panel with draft ISAC Scope of Work <br />December 7 ISAC Scope of Work fmalized <br />December 11-12 ISAC Scope of Work approved by GC (December 2007 GC <br />meeting in Denver, CO) <br />October-December Selection PaneUED/Staff compile pool of candidates <br />200$ <br />January 11 ISAC nominees identified <br />January 25 GC approves nominees/Appoints ISAC <br />January 31 Invitations to join ISAC extended <br />March 11-12 Initial ISAC meeting/planning session (to be held in conjunction <br />with March 2008 AMWG meeting in NE) <br />2
The URL can be used to link to this page
Your browser does not support the video tag.