My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9606
CWCB
>
UCREFRP
>
Public
>
9606
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:36 PM
Creation date
5/22/2009 7:25:47 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9606
Author
BBC Research and Consulting.
Title
Yampa River Basin Water Needs Study.
USFW Year
1996.
USFW - Doc Type
Denver, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />1 <br />1 <br />r <br /> <br /> <br /> <br />SECTION II. <br />Project Administration <br />This section addresses the project team, the performance schedule and the budget. <br />Reporting mechanisms are also identified. <br />L Project Team <br />BBC will perform this study entirely with its own staff. Ed Harvey will direct the <br />effort with day-to-day project manager responsibilities carried out by Doug Jeavons. Jeffrey <br />Eyestone and Kip True, experienced associates within our firm, will also participate. BBC <br />qualifications and individual staff resumes are provided in the following section. <br />Project Reporting Mechanisms <br /> <br />1 <br /> <br />1 <br />fl <br /> <br /> <br />BBC will maintain regular contact with the designated management team <br />representative, presumably Ray Tenney from the River District. Besides telephone contact, <br />we anticipate three client meetings and letter progress reports, if desirable, to update <br />management team participants. We will follow a communications system and coordination <br />plan which best meets the management committee's needs. <br />Project Schedule <br />We understand that the project will commence by October 31, 1996 and be <br />completed by April 1997. This six month performance period should be adequate for the <br />work: any delay in the starting time might delay completion, since we are planning on a six <br />month performance period. Tasks 1 through 3 should be completed by mid-February. <br />Public meetings are envisioned during March, if appropriate, or early April. A draft report <br />should be available in early April, with the final produced by the end of April 1997. <br />Project Budget <br />The project budget, including professional time and out-of-pocket expenses is <br />estimated to be $79,524, based upon the workscope and timeframe provided herein. <br />Billings will be monthly, payable within 30 days. The table outlining the project budget is <br />provided in Exhibit II-1. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.