My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9305
CWCB
>
UCREFRP
>
Public
>
9305
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:34 PM
Creation date
5/22/2009 7:25:06 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9305
Author
U.S. Fish and Wildlife Service.
Title
Final Biological Opinion for the Operation of Flaming Gorge Dam.
USFW Year
1992.
USFW - Doc Type
Denver, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
31 <br />The Service realizes that emergency events may occur that impact <br />Reclamation's ability to comply with this element of the reasonable and <br />prudent alternative. Where emergency circumstances mandate the need to <br />consult in an expedited manner because Reclamation or Western Power <br />determine that they will not be able to conform to the reasonable and <br />prudent alternative for an extended period, consultation may be conducted <br />informally through alternative procedures that the Service determines to <br />be consistent with the requirements of Section 7(a)-(d) of the Act. This <br />provision applies to situations involving acts of God, disasters, <br />casualties, national defense, and security emergencies. If emergency <br />events exceed 20 hours during any month, Western Power will contact the <br />Service to determine if reinitiation of Section 7 consultation is <br />necessary and to examine ways of maintaining flows for the endangered <br />fish. If after informal consultation, aformal-consultation is deemed <br />necessary, it shall be initiated as soon as practical after the emergency <br />is under control. Reclamation and Western Power will submit information <br />on the nature of the emergency action(s), the justification for the <br />expedited consultation, and the impacts to endangered or threatened <br />species and their habitats. The Service will evaluate such information <br />and issue a biological opinion including the information and <br />recomanendations given during the emergency consultation. Western Power <br />will report all short-term emergency events that result in a deviation in <br />the reasonable and prudent alternative on a quarterly basis. <br />2. Conduct a 5-year research program including implementation of winter and <br />spring research flows beginning in 1992 to allow for potential refinement <br />of flows for these seasons. This research program will be based on the <br />Five-Year Flaming Gorge Flow Recommendations Investigation which was <br />approved by the Recovery Program (Appendix B). The program provides for <br />annual meetings to refine seasonal flows based on research findings and <br />water year forecast. Except for specific research flows during the <br />5-year research program, year-round flows in the Green River will <br />resemble a natural hydrograph described under element 1 of the reasonable <br />and prudent alternative. <br />Research needed to further evaluate the winter/spring flows, flow needs <br />and effects in the lower Green River, and research flows for the summer <br />and autumn periods will be established during an annual coordination <br />meeting between Reclamation, Western Power, and the Service in early <br />April after determination of the water year forecast. The Standardized <br />Data Collection Program with supportive studies for the Green River is in <br />place and will be able to monitor fish response to yearly flow patterns <br />(contained in the Five-Year Flaming Gorge Flow Recommendations <br />Investigation, Appendix B). Research beginning in 1992 will focus on the <br />winter and spring seasons. Winter research flows will be established so <br />that various conditions ranging from base loading to full peaking power <br />operations can be further evaluated. This will include at least 1 year <br />of stable winter releases at or below 2,000 cfs and 1 year with a spring <br />peak of approximately 18,000 cfs measured at Jensen gage. If hydrologic <br />conditions do not provide a 18,000-cfs spring peak, then jet tube bypass <br />will be utilized. Spring research flows will examine various spring <br />peaks altering the current established spring flow in both magnitude and <br />
The URL can be used to link to this page
Your browser does not support the video tag.