Laserfiche WebLink
TABLE 1 <br />ESTIMATES OF llEPLETIONS TO THE DUCHESNE RIVER RESULTING FROM FEDERAL <br />PROJECTS <br />Project Owner/Operator Lead Federal <br />Agency Average Annual <br />Depletion (Acre-Feet) <br />Pre-Central Utah Project <br />Strawberry Valley (SVP) USBRlSWUA USBR <br />SVP Transbasin Diversion 61,500' <br />Reservoir Evaporation (SVP) 11,800 v <br />Subtotal 73,300 <br />Provo River USBR/PRWUA USBR 31,700' <br />Moon Lake USBR/MLWUA USBR 24,500 ^~ <br />lvlidview Exch. (Midview Res.) BIA BIA 5,000 s~ <br />Ute Indian Irrigation Project (UI1P) BIA/Ute Tribe ~ BIA 144,000 ~' <br />Central Utah Project <br />Bonn. Unit Transbasin Diversion USBR/CUWCD CUWCD/USBR 101,900' <br />Reservoir Evaporation <br />Strawberry Reservoir 17,700 " <br />Starvation Reservoir 6,800' <br />Upper Stillwater Reservoir 300' <br />Currant Creek Reservoir 500' <br />Duchesne River Area Irrigation 16,000 a~ <br />Bonneville Unit TOTAL 143,200 <br />SUBTOTAL (Historic) 402 00 <br />Uintah Basin Replacement Project <br />Uintah Unit DOUCUWCDBIA CUWCD/DOI 15,000 `~~ <br />Upalco Unit DOUCUWCDBIA CUWCD/DOI 10,30010' <br />SUBTOTAL (New) 25, 300 <br />TOTAL (Historic and New) 447,000 <br />" T~ <br /> <br />