My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002
CWCB
>
UCREFRP
>
Public
>
2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:28 PM
Creation date
5/22/2009 7:12:05 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
2002
Author
U.S. Bureau of Reclamation.
Title
Final Environmental Impact Statement
USFW Year
1986.
USFW - Doc Type
Grand Valley Unit, Stage Two, Colorado River Basin Salinity Control Project, Mesa County, Colorado.
Copyright Material
NO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> CONTENTS <br /> Page_ <br /> Chapter I Purpose and need 1 <br /> Location. 1 <br /> Purpose of the unit 1 <br /> Authorization 2 <br /> Background . 2 <br /> Land features 3 <br /> Irrigation delivery systems 4 <br /> Private systems. 4 <br /> Grand Valley Irrigation Company 4 <br /> Palisade Irrigation District. 5 <br /> Mesa County Irrigation District 5 <br /> Orchard Mesa Irrigation District. 5 <br /> Redlands Water and Power Company. 6 <br /> Federal system 6 <br /> Soil Conservation Service studies 7 <br /> Colorado River Basin salinity 8 <br /> Salt loading from Grand Valley Unit area. 11 <br /> Chapter II Stage One monitoring 12 <br /> Hydrosalinity monitoring. 12 <br /> Wildlife monitoring 13 <br /> Chapter III Alternatives 16 <br />• Scope of the study. 16 <br /> Criteria and considerations for plan <br /> formulation 16 <br /> Recommended plan (alternative B). 18 <br /> Plan concepts and estimated accomplishments. 18 <br /> Plan features. 20 <br /> Canal improvements. 20 <br /> General . 20 <br /> East end portion of the Government <br /> Highline Canal 23 <br /> Middle portion of the Government <br /> Highline Canal 23 <br /> West end portion of the Government <br /> Highline Canal 24 <br /> Cross-drainage facilities 24 <br /> Moss and debris removal structures 25 <br /> Lateral improvements. 26 <br /> Fish and wildlife measures 26 <br /> Construction facilities. 28 <br /> Geology and construction materials 28 <br /> Geology 28 <br /> Construction materials. 30 <br /> Rights-of-way. 31 <br /> Government Highline Canal and lateral <br /> system. 31 <br /> systems <br />Private irrigation 32 <br /> : <br />• <br />General 32 <br /> Administration 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.