Laserfiche WebLink
• <br /> CONTENTS <br /> Page_ <br /> Chapter I Purpose and need 1 <br /> Location. 1 <br /> Purpose of the unit 1 <br /> Authorization 2 <br /> Background . 2 <br /> Land features 3 <br /> Irrigation delivery systems 4 <br /> Private systems. 4 <br /> Grand Valley Irrigation Company 4 <br /> Palisade Irrigation District. 5 <br /> Mesa County Irrigation District 5 <br /> Orchard Mesa Irrigation District. 5 <br /> Redlands Water and Power Company. 6 <br /> Federal system 6 <br /> Soil Conservation Service studies 7 <br /> Colorado River Basin salinity 8 <br /> Salt loading from Grand Valley Unit area. 11 <br /> Chapter II Stage One monitoring 12 <br /> Hydrosalinity monitoring. 12 <br /> Wildlife monitoring 13 <br /> Chapter III Alternatives 16 <br />• Scope of the study. 16 <br /> Criteria and considerations for plan <br /> formulation 16 <br /> Recommended plan (alternative B). 18 <br /> Plan concepts and estimated accomplishments. 18 <br /> Plan features. 20 <br /> Canal improvements. 20 <br /> General . 20 <br /> East end portion of the Government <br /> Highline Canal 23 <br /> Middle portion of the Government <br /> Highline Canal 23 <br /> West end portion of the Government <br /> Highline Canal 24 <br /> Cross-drainage facilities 24 <br /> Moss and debris removal structures 25 <br /> Lateral improvements. 26 <br /> Fish and wildlife measures 26 <br /> Construction facilities. 28 <br /> Geology and construction materials 28 <br /> Geology 28 <br /> Construction materials. 30 <br /> Rights-of-way. 31 <br /> Government Highline Canal and lateral <br /> system. 31 <br /> systems <br />Private irrigation 32 <br /> : <br />• <br />General 32 <br /> Administration 34 <br />