My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4208
CWCB
>
UCREFRP
>
Public
>
4208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:28 PM
Creation date
5/22/2009 7:10:23 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
4208
Author
U.S. Bureau of Reclamation.
Title
Development in the Upper Colorado Basin, The Bureau of Reclamation Defends Itself.
USFW Year
n.d.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE RFrr.eMeTION ERA, August, 1963 <br />1963 -FIRST PAYOFF ON THE CRSP <br />The seed from Which the giant Colorado River <br />Storage Project Would grout and blossom was <br />planted 7 years ago. Development of this <br />beautiful corrugated country captured the <br />imaginations of all kinds of Americans both <br />near and far. <br />M_en's eyes sparkled at the thoughts-irri~,- <br />tion_ of fertile virgin lands, electricity for new and <br />esis ing nt r~ri . d silt.ing~ .r .A_ .ion in etnn_ <br />ishin? scenerv, tourist potential to scenic wonders <br />rarer yet beheld, and employment opportunities- <br />all from water not now being used in the Upper <br />Colorado River Basin and most of it wasting away <br />to the sea. <br />In 1956, the Congress passed the authorizing <br />legislation. The brand plan for development of <br />the Upper Colorado River Basin water was set <br />in motion. <br />Now in 1963, the reaping of the. first harvest <br />of benefits are beginning. And. in the coming <br />years, the benefits will a o~v in magnitude to equal <br />or exceed the hopes and dreams of the most opti- <br />mistic Upper Basin proponents. <br />The first CRSF hydroelectric power will bo on <br />the ]ine from the Flaming Gorge Powerplant. <br />Boaters are flocking to reservoirs which have <br />formed behind the storabe unit dams-Lake <br />Powell (Glen Canyon Reservoir) on the Colorado <br />River, Flaming Gorge Reservoir on the Green, <br />and Navajo Lake on the San Juan. <br />This year water will be delivered for <br />irrigation use on four completed partici- <br />pating Federal Reclamation projects with <br />about 7,500 acres of nex land and 36,000 <br />acres of supplemental land. <br />In the coming years, the trickle of <br />1963 benefits will swell to a torrent. <br />Growth in irrigation agriculture in <br />the Basin will lay the cornerstone for <br />stable growth in the intermountain west. <br />Livestookpmduction centers on coor- <br />dinating the use of the grazing lands of <br />the Upper Basin and of the broad dryland <br />plateaus with the livestock feed base <br />produced on the irrigated lands. With <br />the expansion of the irrigated lands, <br />the livestock industry also can expand <br />--to the benefit of the entire Nation. <br />Other Imps raised will be deciduous <br />fruits, sugar beets, and other cash crops <br />not in surplus <br />But equally important is that stable <br />irrigation agriculture provides the core <br />on which a more complex commercial and <br />industrial development Will be built. <br />In the process of diversified economic <br />growth, the participating projects and <br />other non~overnment development and use <br />of Upper Basin Water will supply large <br />quantities of water for municipal and <br />industrial uses. <br />POWER FOR RDGIONAL GROWTH <br />Electric power needs will increase by <br />;_ leaps and bounds, as the- economy of .the <br />intermountain west expands and diversi- <br />fies. A sma]1 part of this demand will <br />be met by the 3i3rdroeleetric power to be <br />produc~l at the CRSP damn .ands: powerplants . <br />From 1963 ~ 1967, most of the 1,300,000 <br />dilowatts of CRSP installed capacity <br />-~~wi1.l be fed into the Interconnected <br />Transmission System. This system will <br />be made up of about 2,000 miles of CRSP <br />transmission lines (about 1,300 miles <br />are pox completed or under construction) <br />which will tie into 4,700 miles of adja- <br />cent Federal system lines and intercon- <br />nect with more than 7,200 miles of Pro- <br />ference user and private utility lines. <br />CRSP power output will go to more than <br />200 qualified preference user organiza- <br />tions, as required by Federal Reclamation <br />law, throughout the marketing area cover- <br />ing the intermountain west. The full <br />production of CRSP power will be taken <br />by the preference users as rapidly as it <br />comes on the line. But CRSF power will <br />help only to meet preference user load <br />~~~ • <br />Looking ahead to 1980, the total ins <br />stalled capacity needed to meet all the <br />anticipated electricpower needs i.n the <br />intermountain west will approach 20 <br />million kilowatts. At the present time, <br />° there are only about 5 million kilowatt <br />_1Q - <br />
The URL can be used to link to this page
Your browser does not support the video tag.