My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7414 (2)
CWCB
>
UCREFRP
>
Public
>
7414 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:30 PM
Creation date
5/22/2009 7:01:38 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7414
Author
U.S. Army Corps of Engineers.
Title
Sandstone Dam and Reservoir, Municipal, Agricultural and Industrial Water Supply Project Carbon County, Wyoming
USFW Year
1988.
USFW - Doc Type
Draft Environmental Impact Statement.
Copyright Material
NO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />Rock surfaces at the. ogee and downstream would be lined with <br />concrete slabs anchored into the rock. Overburden above the rock <br />cuts would be behind retaining walls to an elevation well above <br />the maximum waterline.. <br />3.24 The chute section of the spillway would be in two parts: <br />an upper part with a slope of 2 percent and a lower, steeper part <br />with a slope of 50 percent. The chute section would be 90 feet <br />wide and all water bearing surf aces, would be concrete lined. <br />Rock cuts would be lined with concrete slabs anchored to the rock <br />and provided with drains whereas the overburden above the rock <br />would be contained. by retaining walls to well above the water <br />line. <br />3.25 The spillway stilling basin would measure 90 feet wide by <br />about 215 feet long and 42 feet deep. The discharge channel <br />would be riprapped along its entire length of about 1,100 feet to <br />Savery Creek. <br />3.26 The Sandstone Dam would be located at the northern end of <br />Carbon County Road 561 which extends north from State Highway 70 <br />at the town of Savery, 4Jyoming. Some improvement to the county <br />road would. be be required to support increased traffic during <br />construction as well as provide permanent access to the project <br />area. A short section of trail would be improved in the vicinity <br />of the dam to provide access to the dam crest by means of a <br />bridge over the spillway. Four-wheel drive vehicle trails would <br />provide limited access to the upper reaches of the east side of <br />the reservoir. <br />3.27 Field reconnaissance has not revealed the existence of <br />electric or telephone utilities in the Savery Creek valley north <br />• of the Boyer Ranch. Therefore, the only relocation or <br />3-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.