Laserfiche WebLink
<br />DRAFT ENVIRONMENTAL IMPACT STATEMENT <br />Taylor Drar Raservair <br />Rio Blanco County, Colorado <br />• The responsible lead agency is the U.S. Army Engineer District, <br />Sacramento. The Environmental Protection Agency, U.S. Parr Service, <br />Bureau of Land. Management. U.S. Fish and Wildlife Service. Soil <br />Conservation Service, Colorado Historical Society, and Colorado <br />• Division of Wildlife assisted as cooperating agencies by informally <br />reviewing a preliminary draft of this document. <br />AbstLa~: This document considers the envi ronmantal impacts <br />associated with the construction of a dam and reservoir near Taylor <br />Draw upstream from the town of Rangely, Colorado. The document was <br />prepared as part of the Corps of Engineers permit process under <br />Section 404 of the Clean Water Act [33 U.S.C. 1344), Tha fora~at <br />follows the guidelines of the Council on Environmental Quality f40 CFR <br />1500 - 1508]. <br />A comparative impact assessment of alternatives to a Taylor Drew Dam <br />is presented. <br />Further information on this statement may be obtained from: <br />.Mr. Jim Gibson <br />U.S. Army Engineer District, Sacramento <br />650 Capitol Mall <br />Sacramento, Ce li forni a 95814 <br />Telephone: Commercial-(916) 440-2541 <br />FTS 448-2541 <br />SEND COMMENTS ON THIS STATEMENT TO THE DISTRICT ENGINEER, AT TN: <br />SPKCO-0 AT .THE ABOVE ADDRESS BY_______10 NWY 1982 _____. Please <br />retain your copy of this DEIS. Portions of this document may not b® <br />reprinted in the fine L document in accordance with Council on <br />Envi ranmenta l Quality Regulations. <br /> <br /> <br />-i- <br />