My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7869
CWCB
>
UCREFRP
>
Public
>
7869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:31 PM
Creation date
5/22/2009 6:54:25 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7869
Author
FLO Engineering, I.
Title
Concept Development Report, Grand Valley Irrigation Company, Diversion Dam Fish Passage Structure, Palisade, CO.
USFW Year
1996.
USFW - Doc Type
Contract No. 1425-6-CA-40-1730A,
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r' <br />TABLE OF CONTENTS, Continued <br />Figure 4.2b Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Water Surface Elevation versus Flow Rating Curve <br /> for Section 400.24 (Downstream from Dam, Left Side of Channel) ................ 20 <br />Figure 4.2c Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Head versus Flow for Section 400.24 (Floodgates, Right Side of Channel) ......... 21 <br />Figure 4.3a Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Water Surface Elevation versus Flow Rating Curve <br /> for Section 400.26, (Upstream from Dam, Right Side of Channel) ................ 22 <br />Figure 4.3b Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Water Surface Elevation versus Flow Rating Curve <br /> for Section 400.26 (Downstream from Dam, Left Side of Channel) ................ 22 <br />Figure 4.4a Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Water Surface Elevation versus -Flow Rating Curve <br /> for Section 400.33 (Upstream from Dam, Right Side of Channel) ................. 23 <br />Figure 4.4b Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Water Surface Elevation versus Flow Rating Curve <br /> for Section 400.33 (Downstream from Dam, Left Side of Channel) ................ 23 <br />Figure 4.5a Grand Valley Irrigation Company Diversion Dam Fish Passage Study, .. <br /> Water Surface Elevation versus Flow Rating Curve <br /> for Section 400.37 (Upstream from Dam, Right Side of Channel) ................. 24 <br />Figure 4.5b Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Water Surface Elevation versus Flow Rating Curve <br /> for Section 400.37 (Downstream from Dam, Left Side of Channel) ................ 24 <br />Figure 4.6 -Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Water Surface Elevation versus Flow Rating Curve <br /> for Section 400.4 ...................................................... 25 <br />Figure 4.7 Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Flow over Weir Section between 400.40 and 400.37 versus Total Flow ............ 27 <br />Figure 4.8 Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Flow over Weir Section between 400.37 and 400.33 versus Total Flow ............ 27 <br />Figure 4.9 Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Flow over Weir Section between 400.33 and 400.26 versus Total Flow ............ 28 <br />Figure 4.10 Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Flow over Weir Section between 400.26 and 400.24 versus Total Flow ............ 28 <br />Figure 4.11 Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Flow through Gates versus Total Flow ...................................... 29 <br />Figure 4.12 Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br /> Flow through Gates versus Total Flow on Left Side ................. . ......... 29 <br />Figure 5.1 Conceptual Plan View of Alternate 1 Fish Passage ............................ 36 <br />Figure 5.2.A Conceptual Plan View of Alternate 2A Fish Passage ........................... 41 <br />Figure 5.2.B Conceptual Plan View of Alternate 2B Fish Passage ........................... 43 <br />Figure 5.3 Conceptual Plan View of Alternate 3 Fish Passage ............................ 49 <br />Figure 5.4 Project Plan View with Existing Flow Patterns and Potential Improvements ......... 55 <br />Figure 5.5 Comparison of Pre-Structure and Post-Structure 100-yr Flood Elevations .......... 57 <br />Figure 5.6 Comparison of Pre-Structure and Post-Structure 100-yr Flood Elevations <br /> with FEMA Flood Insurance Study Data .................................... 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.