Laserfiche WebLink
TABLE OF CONTENTS, Continued <br />5.5.4 Maintenance .......................................................... 56 <br />5.6 Floodplain Analysis ......................................................... 56 <br />VI. PERMITTING ................................................................... 58 <br />VII. REFERENCES ................................................................. 58 <br />List of Tables <br />Table 3.1 Peak Discharges by Return Period <br />for the Colorado River at Palisade .......................................... 7 <br />Table 3.2 Flow Statistics for Monthly Mean Flows, Water Years 1965-1996 <br />at Design Location Upstream from OMID bypass Canal (FLOW 2) ................ 11 <br />Table 3.3 Flow Statistics for Monthly Mean Flows, Water Years 1965-1996 <br />at Design Location Downstream from OMID Bypass Canal <br />and Upstream from GVIC Canal (FLOW 3) .................................. 12 <br />Table 3.4 Flow Statistics for Monthly Mean Flows, Water Years 1965-1996 <br />at Design Location Downstream from GVIC Canal and <br />Upstream from OMID Return (FLOW 3a) ................................... 13 <br />Table 3.5 Flow Statistics for Monthly Mean Flows, Water Years 1965-1996 <br />at Design Location Downstream from OMID Return (FLOW 4) ................... 14 <br />Table 4.1 Summary of Cross Sections Utilized to Model Hydraulics <br />of the Colorado River ................................................... 17 <br />Table 5.1 Alternative 1 Conceptual Design Construction Cost Estimate .................... 39 <br />Table 5.2 Alternative 2A Conceptual Design Construction Cost Estimate ................... 45 <br />Table 5.3 Alternative 26 Conceptual Design Construction Cost Estimate ................... 46 <br />Table 5.4 Alternative 2B (with concrete cut-off walls) Conceptual Design <br />Construction Cost Estimate .............................................. 47 <br />Table 5.5 Alternative 3 Conceptual Design Construction Cost Estimate .................... 50 <br />List of Figures <br />Figure 2.1 Project Site Location Map ................................................ 3 <br />Figure 2.2 Overview of Existing Project Site Features ................................... 4 <br />Figure 3.1 Project Plan with Hydrology Design Locations ................................ 10 <br />Figure 4.1 Project Plan View with Cross Section Locations GVIC Diversion ................. 16 <br />Figure 4.2a Grand Valley Irrigation Company Diversion Dam Fish Passage Study, <br />Head versus Flow for Section 400.24 (Floodgates, Right Side of Channel) ......... 20 <br />t <br />~f <br />