Dallas Creek Project: Ridgway Dam Em- Estimated Contruction Costs of Colorado River Storage Project <br />bankment topped out July 23, 1986. Work and Participating Projects (Section 5 and Section 8 Facilities with Projected <br />on the river outlet works and instrumenta- Increases from 1956 (initial) to Project Completion. <br />tion continued. Water started filling be Cost Projections as of September 30, 1986.) <br />hind the dam in early 1987. The reservoir <br />will have a surface area of 1,030 acres. $344 <br /> <br />Construction totaling $19.6 million was 6.0 1 MILLION <br />5.5 , 1*Inulll II, 1 <br />completed. Ifilill;11111111111-111 <br /> 5.0 RIII 0 Additional Section 8 Costs <br />Seedskadee Project: Spring runoff into $1,871 <br />cc 4 <br />5 <br /> <br />Fontenelle Reservoir in southwestern . <br />I 111111 I I MILLION Other Cost Changes <br />5 wIlllill,l I li <br /> <br />Wyoming was 167 percent of normal. The J 4.0 1141 III II 4 (Changes in Plan. Reanalysis of Quantities and Unit <br />Prices. Legislative Additions. Unforeseen Conditions. <br />° <br />dam's outlets were operating at maxi- c I I <br />3.5 ¦ I n etc.) <br />mum capacity but the inflows still ex- ° <br />w 3.0 II In IIII 111 $2,310 /Cost Increases Due To Inflation <br />ceeded the outlet capacity. The high run- o IIVr1"III I' I I MILLION <br />s I II I'll I <br />z <br />off swept debris into the reservoir, . <br />IMrlll blil'll i' Subsequent New Authorizations <br />? <br />clogging the trashracks of the <br />partially _ <br />m 2.0 Mot lll I. 1962 Navajo Indian Irrigation Project, San Juan- <br />Chama <br />outlet works. Divers were enlisted to dis- 1.5 I Ilir t $709 1965 Bostwick Park, Fruitland Mesa, Savery-Pot Hook <br />IIf I MILLION 1968- Animas-LaPlata. Dallas Creek, Dolores. San <br />lodge the debris which was curtailing the 1.0 ntnlulu 11 III I Miguel. West Divide. Uintah Unit-CUP <br />tanned releases from the reservoir. The <br />P <br />Uti111 n .I $936 <br />I <br />Initial Authorizations 11sss) <br />5 <br />outlet works were closed during the div- Iwttlll <br />iill III lit MILLION <br />uY1I IIII Storage Units- Aspinall (Curecanti). Flaming Gorge, <br />ing operation. .0 Glen Canyon, Navajo <br />Participating Projects: Florida. Paonia, Silt. Smith <br /> <br />Safety of Dams work on the test section 'Only $760 Million was initially appropriated Fork, Hammond. Central Utah, Emery County. Lyman, <br />by Congress Seedskadee. La Barge'. Pine River Extension' <br />of Fontenelle Dam started in 1985. The 'Deferred i ini tely <br />in 1962 <br /> <br />work is not funded by the CRSP. The 'Deauthorized ed in 1997 71 <br />results of this contract, currently valued <br />at $6.7 million, will determine how the <br />final repair of the dam will be accom- Construction Costs - Annual and Accumulated <br />plished. The work was 95 percent com- Annual Accumulated <br />plete by the end of the fiscal year. As a <br />result of the low reservoir elevation, the Transitional quarter and <br />powerplant at Fontenelle is not in use. fiscal year 1977 131,750,705 <br /> To date as of September 30, 1977 1,266,144,556 <br />Navajo Storage Unit: Investigations, Fiscal year 1978 89,001,375 <br />which were completed in 1984, into seep- <br />To date as of September 30, 1978 1,355,145,931 <br />age at Navajo Dam have been underway <br />since it first filled. Subsequent investiga- Fiscal year 1979 95,067,380 <br />tive reports recommended that although To date as of September 30, 1979 1,450,213,311 <br />no damage to the core of the dam has Fiscal year 1980 130,357,851 <br />been identified, a construction program To date as of September 30, 1980 1,580,571,162 <br />be initiated to control the seepage. A con- Fiscal year 1981 166,678,707 <br />tract for the construction of a concrete To date as of September 30, 1981 1,747,249,869 <br />diaphragm wall in the left abutment was Fiscal year 1982 170,316,665 <br />awarded in September 1986 for To date as of September 30, 1982 1,917,566,534 <br />$9,756,000. A series of pipes, drains and Fiscal year 1983 200,673,141 <br />drainage tunnels will be installed on the To date as of September 30, 1983 2,118,239,675 <br />right abutment. <br /> Fiscal year 1984 193,233,741 <br /> To date as of September 30, 1984 2,311,473,416 <br /> Fiscal year 1985 175,924,067 <br /> To date as of September 30, 1985 2,487,397,483 <br /> Fiscal year 1986 170,956,660 <br /> To date as of September 30, 1986 2,658,354,143