Laserfiche WebLink
TABLE OF CONTENTS <br />Page <br />I. INTRODUCTION 1 <br />A. Objective 1 <br />B. Approach 1 <br />C. Directives and Guidelines 2 <br />D. Need for Additional Clarification from <br /> the Executive Review Committee 3 <br />E. Process To Be Followed 3 <br />II. FISCAL YEAR 1989 MONITORING, DATA ANALYSIS, <br /> AND INTEGRATED STUDY PLAN 5 <br />A. Sediment Studies 5 <br />B. Trout Fishery Studies 8 <br />C. Endangered Fish Studies 11 <br />D. Economic Studies 12 <br />E. Integration Studies 13 <br />III. BOUNDARIES IN THE DESIGN OF THE TECHNICAL <br /> STUDY PROGRAM 16 <br />A. Sediment Studies 16 <br />B. Trout Fishery Studies 17 <br />C. Endangered Fish Studies 18 <br />D. Economic Studies 19 <br />E. Integration of Phase II Studies 21 <br />IV. CRITICAL FISCAL YEAR 1989 STUDY NEEDS 23 <br />A. Flow Regulation 23 <br />B. Summary of Fiscal Year 1989 Funding <br /> for Each Study Segment (Estimated) 23 <br />C. Additional Costs (Undetermined) 24 <br />D. Total Estimated Cost for Fiscal Year <br /> 1989 GCES Technical Studies 24 <br />V. DEVELOPMENT OF AN INTEGRATED STUDY PLAN <br /> FOR FISCAL YEARS 1990-91 25 <br />APPEN DIX 1: Glen Canyon Environmental Studies <br /> Interim Team Integration Team, <br /> Memorandum, November 28, 1988 27 <br />