My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9659
CWCB
>
UCREFRP
>
Public
>
9659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:37 PM
Creation date
5/20/2009 3:23:05 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9659
Author
U.S. Bureau of Reclamation.
Title
Price Stubb Fish Passage - Revised Supplemental Draft Environmental Assessment.
USFW Year
2004.
USFW - Doc Type
Grand Junction, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Revised Supplemental Draft Environmental Assessment-Chapter 3-Affected <br />Environment and Environmental Consequences <br /> <br />Existing Conditions: Three existing water rights cite the Price-Stubb Diversion <br />Dam as their decreed point of diversion. The first of these is a 573 cfs water right for <br />power generation with an appropriationS -date of October 1, 1889 and adjudication6 date <br />of July 22, 1912. This right is owned by the Palisade Irrigation District (PID) and was <br />used to operate hydraulic pumps to lift their irrigation water. The power right has not <br />been used since 1918; since then, PID's water has been delivered through the <br />Government Highline Canal. The Palisade Irrigation District has retained the right to use <br />the power right to pump irrigation water if irrigation deliveries cannot be made through <br />the Government Highline Canal. <br /> <br />The second right is a 2,100 cfs conditional water right 7 for hydroelectric power <br />generation with an appropriation date of December 20, 1980 and an adjudication date of <br />December 31, 1983. This right is owned by Mr. Eric Jacobson and is associated with the <br />proposed Jacobson Hydro No. 1 Project, which would use the Price-Stubb Diversion <br />Dam to divert Colorado River flows to its hydropower plant. As discussed previously, it <br />is assumed that the Hydro No.1 Project would not be constructed because of the <br />terminated FERC license. <br /> <br />The third right is a 120 cfs water right for domestic, municipal and industrial uses with an <br />appropriation date of February 17, 1947 and adjudication. date of July 25, 1959. Eighty <br />cfs of this right is owned by the City of Grand Junction, 20 cfs by the Clifton Water <br />District and 20 cfs by the Water Development Company. The decree for this right lists <br />five alternate points of diversion, with the Price-Stubb Diversion Dam being one of the <br />decreed points. Approximately 19 cfs ofthis right has been made absolute8. The right <br />was perfected by pumping from the Colorado River at the Clifton Water District <br />Treatment Plant approximately 6 miles downstream from the Price-Stubb Diversion <br />Dam. No water has been diverted at the Price-Stubb Diversion Dam under this water <br />right. <br /> <br />Impacts <br /> <br />No Action: The No Action alternative would have no effect on these water rights. <br />The opportunity to use prD' s power right to lift irrigation water if the Government <br />Highline Canal was unable to make deliveries would continue. The probability of using <br />the Price-Stubb Diversion Dam to provide an emergency irrigation water supply is very <br />remote. Pumping and conveyance facilities to support this use no longer exist, and it <br />would require a substantial amount of time and money to reestablish them. Likewise, the <br />opportunity to use the Price-Stubb Diversion Dam' as a forebay to pump domestic, <br />municipal and industrial water would continue. However, the probability of using this <br /> <br />5 Appropriation: applying water to a beneficial use. Often used interchangeably with the term water right. <br /> <br />6 Adjudication: the judicial process through which existence of a water right is confirmed by court decree. <br /> <br />7 Conditional water right: an appropriation that has not yet been made absolute by the water court. <br /> <br />8 Absolute: In Colorado, a conditional water right owner must prove diligence in completing work <br />necessary to apply the water to a beneficial use before the water court makes the water right absolute (also <br />termed perfected). <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.