My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9659
CWCB
>
UCREFRP
>
Public
>
9659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:37 PM
Creation date
5/20/2009 3:23:05 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9659
Author
U.S. Bureau of Reclamation.
Title
Price Stubb Fish Passage - Revised Supplemental Draft Environmental Assessment.
USFW Year
2004.
USFW - Doc Type
Grand Junction, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Revised Supplemental Draft Environmental Assessment-Chapter 3-Affected <br />Environment and Environmental Consequences <br /> <br />Water Resources <br /> <br />Ute Water Conservancy District Pump Plant Intake <br /> <br />Issue: Dam modification or removal could adversely- affect Ute Water's ability to <br />pump water from the Colorado River. <br /> <br />Existing Conditions: Ute Water provides water to about 60,000 residents of the <br />Grand Valley. Their primary water supply is transported via a pipeline from the Plateau <br />Creek drainage off the Grand Mesa. Ute Water's pump plant is located approximately <br />2,000 feet upstream of the dam and is normally used as an emergency backup water <br />supply. <br /> <br />Pumping operations require a water surface elevation of about 4,722 feet in the river <br />(Collins, 1999). The dam helps maintain the required water elevation for pumping <br />operations, especially during low flow conditions. <br /> <br />Impacts <br /> <br />No Action: The No Action alternative would allow Ute Water to operate their <br />pump plant as they have historically. <br /> <br />Conventional Fish Ladder: Same impacts as No Action Alternative. <br /> <br />Downstream Rock Fish Passage: Predicted similar to the No Action Alternative. <br /> <br />Downstream Rock Fish Passage with Whitewater Recreati()n Features: <br />Predicted similar to the No Action Alternative. <br /> <br />Dam Removal: As discussed above, the Ute Water pump plant requires a river <br />elevation of at least 4,722 feet. With the dam removed, the river elevation would drop <br />below 4,722 feet whenever the flow is less than 5,500 cfs. Review of historic flow data <br />(average of monthly mean flows from.1933 through 1996) shows Colorado River flows <br />are usually below 5,500 cfs for 9 months each year, from August through April. <br /> <br />Water Rights <br /> <br />Issue: Owners of existing water rights with decreed points of diversion at the <br />Price-Stubb Diversion Dam have raised issues regarding potential impacts and the future <br />utilization of their water rights under the Dam Removal alternative. <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.