My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9659
CWCB
>
UCREFRP
>
Public
>
9659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:37 PM
Creation date
5/20/2009 3:23:05 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9659
Author
U.S. Bureau of Reclamation.
Title
Price Stubb Fish Passage - Revised Supplemental Draft Environmental Assessment.
USFW Year
2004.
USFW - Doc Type
Grand Junction, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Revised Supplemental Draft Environmental Assessment-Chapter 2-Alternatives <br /> <br />CHAPTER 2-ALTERNATIVES <br /> <br />This chapter describes the No Action alternative, and alternatives for providing fish <br />passage through or around the existing Price-Stubb Diversion Dam. Four alternatives for <br />fish passage are given detailed consideration: constructing a Conventional Fish Ladder, <br />constructing a Downstream Rock Fish Passage, constructing a Downstream Rock Fish <br />. Passage with Whitewater Recreation Features, and Dam Removal. <br /> <br />Preferred Alternative <br /> <br />Reclamation has identified the Downstream Rock Fish Passage with Whitewater <br />Recreational Features Alternative as its preferred alternative contingent on Colorado <br />Department of Transportation (CDOT) approval and available non-Recovery Program <br />funding for the whitewater features. Reclamation and the Recovery Program believe this <br />alternative would best meet project purposes while protecting existing upstream uses and <br />provide desired public safety and recreation. The alternative also minimizes the need for <br />fish passage operation and maintenance. <br /> <br />Construction access is limited near the Price-Stubb Diversion Dam and headworks. The <br />dam is constricted by the Union Pacific Railroad on river-right and Interstate 70 on river- <br />left. If the Conventional Fish Passage alternative were constructed independently from <br />the Jacobson Hydro No.1 Project, access for construction and operations of the Jacobson <br />Hydro No.1 Project would be severely limited. The dam would continue to be a hazard <br />to river recreation and the general public. In addition, having two concurrent concrete <br />fish ladders (Price-Stubb and Grand Valley Project Diversion Dams) within a short reach <br />of the river would likely be less beneficial to endangered fish. Therefore, Reclamation <br />has not identified the Conventional Fish Ladder alternative as its preferred alternative. <br /> <br />The Dam Removal alternative would be most beneficial to endangered fish and river <br />recreation, but would adversely affect upstream water rights and hydropower, Ute Water <br />pumping plant, and may affect existing facilities (railroad, Interstate 70 and Colorado <br />River Siphon). Therefore, Reclamation has not identified the Dam Removal alternative <br />as its preferred alternative. <br /> <br />The Downstream Rock Fish Passage alternative provides benefit to endangered fish while <br />protecting existing water rights, existing facilities, and hydropower potential. The <br />Downstream Rock Fish Passage alternative would not address public safety issues <br />associated with the dam or improve conditions for river recreation, and the dam would <br />continue to be impassible to watercraft. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.