Laserfiche WebLink
CONTRACT AD <br />CONTRACT ADMINISTRATION <br />CONTRACT MODIFICATIONS (Cont.) <br />Mod 007 3/14/96 Three ladder openings in the 36-inch chain link fence; addition of <br />W8X18 beam accross the opening in front of 42-inch pipe at <br />forebay structure; revision and construction of lifting scheme for <br />baffles. Increase to contract $1,556.75. <br />Mod 008 4/24/96 Furnish and place grouted rip rap for protection of entrance <br />structure. Increase in contract value $8,946.06. Time extended to <br />April 11, 1996. <br />Mod 009 4/24/96 Furnish and place compacted backfill on river side of forebay <br />structure. Increase in contract value $8,494.00. Time extended to <br />April 13, 1996. <br />Mod 010 5/9/96 Furnish and install a 2-inch drain line and manhole to drain city of <br />Grand Junction's 18-inch waterline. Increase in contract value <br />$9,918.51. Time extended to April 19, 1996. <br />Mod 011 5/9/96 Cosntruct an expansion joint between entrance structure and its <br />retaining wall. Increase in contract value 2,787.99. Time <br />extended to April 24, 1996. <br />Mod 012 5/16/96 Deletion of bid item 16, Seeding. Decrease in contract value <br />$7,500.00. <br />Mod 013 10/02/96 Cutting of fish bucket screens from 9'0" to 8'6". Increase in <br />contract value $360.00. <br />Cont Ad-3