Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CONTRACT AD <br /> <br />CONTRACT ADMINISTRATION <br /> <br />CONTRACT MODIFICATIONS (Coot.) <br /> <br />Mod 007 3/14/96 Three ladder openings in the 36-inch chain link fence; addition of <br /> W8X18 beam accross the opening in front of 42-inch pipe at <br /> forebay structure; revision and construction of lifting scheme for <br /> baffles. Increase to contract $1,556.75. <br />Mod 008 4/24/96 Furnish and place grouted rip rap for protection of entrance <br /> structure. Increase in contract value $8,946.06. Time extended to <br /> April 11, 1996. <br />Mod 009 4/24/96 Furnish and place compacted backfill on river side of forebay <br /> structure. Increase in contract value $8,494.00. Time extended to <br /> April 13, 1996. <br />Mod 010 5/9/96 Furnish and install a 2-inch drain line and manhole to drain city of <br /> Grand Junction's 18-inch waterline. Increase in contract value <br /> $9,918.51. Time extended to April 19, 1996. <br />Mod 011 5/9/96 Cosntruct an expansion joint between entrance structure and its <br /> retaining wall. Increase in contract value 2,787.99. Time <br /> extended to April 24, 1996. <br />Mod 012 5/16/96 Deletion of bid item 16, Seeding. Decrease in contract value <br /> $7,500.00. <br />Mod 013 10/02/96 Cutting of fish bucket screens from 9'0" to 8'6". Increase in <br /> contract value $360.00. <br /> <br />Cont Ad-3 <br />