Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CONTRACT AD <br /> <br />Mod 001 <br /> <br />Mod 002 <br /> <br />Mod 003 <br /> <br />Mod 004 <br /> <br />Mod 005 <br /> <br />Mod 006 <br /> <br />CONTRACT ADMINISTRATION <br /> <br />CONTRACT MODIFICATIONS <br /> <br /> <br />08/28/95 Reservation of Funds in the amount of $999,616.00. <br /> <br />12/5/95 Undefmitized mod. for unsuitable foundation material and <br />fumsihing and installing oversize pit run material for stabilization <br />at forebay structure. <br /> <br />1/18/96 Defmitization of mod. 002. Increase to contract $7,000.00. <br /> <br />3/28/96 Entrance structure flooding. Increase to contract $13,461.16. <br />Time extended to April 3, 1996. <br /> <br />3/28/96 Time extension because of mod. 003. New completion date April <br />6, 1996. <br /> <br />3/28/96 Concrete blocking on horizontal bends on 42-inch diameter <br />concrete pipe. Increase to contract $8,000.00. Time extended to <br />April 8, 1996. <br /> <br />ContAd-2 <br />