Laserfiche WebLink
1 <br />AiWt 2000 aWCD * Yanpa Riw Basin SnO RaerrwSa,d - Pike 2 Rgoon * TOC ? ii <br />5.1.2 Phase 2 ...................................................................-................................................................ 44 <br />5.2 PROJECT CONCLUSIONS AND RECOMMENDATIONS .......................................................... 46 <br />5.2.1 Track I and Track 2 Sites ......................................................................................................... 46 <br />5.2.2 Track 3 Sites ............................................................................................................................. 47 <br />' 6.0 LIST OF REFERENCES ......................................................................................................................48 <br />1 1ST 0F-TAR? ES _ <br />Table No. Description Page No. <br />1 Summary of Potential Sites From Phase 1 That Warrant Further <br /> <br /> <br />1 <br /> <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />Consideration 9 <br />2 Potential Sites for Year 2000 Field Reconnaissance 14 <br />3 Matrix Evaluation of Field Reconnaissance Sites 42 <br />4 Conceptual Cost Estimates for Phase 2 Sites Retained 42 <br />LIST OF FIGURES <br />Figure No. Description Page No. <br /> <br />1 Study Area 2 <br />2 Yampa River Basin Drainages 4 <br />3 Locations of Yampa River Basin Gaging Stations 5 <br />4 Basin Water Demands 7 <br />5 Summary of Potential Small Reservoir Sites Retained 10 <br />6 Field Reconnaissance Sites in the Lower Yampa River Study Area 15 <br />7 Field Reconnaissance Sites in the Williams Fork River Study Area 16 <br />8 Surficial Geology Map of Field Reconnaissance Area 19 <br />9 Geologic Map of Field Reconnaissance Area 20-21 <br />10 Little Bear 1 Reservoir Site 24 <br />11 Little Bear 2 Reservoir Site 27 <br />12 South Fork 1 Reservoir Site 29 <br />13 South Fork 2 Reservoir Site 32 <br />14 Rampart Reservoir Site 34 <br />15 Monument Butte Reservoir Site 37 <br />LIST OF APPENDICES <br />Appendix No. Description <br />A Estimate of Annual Yield for Gaged Basin Streams <br />B Potential Reservoir Site Photographs <br />C Phase 2 Small Reservoir Construction Cost Estimate <br />I ifmV ray Watson • A0 Bw 774018 * Sawix at Sp ig, Com,h 80477 + (970) 879-6260 <br />uicvrioss/MM2Rgot <br />w?WWH