Laserfiche WebLink
1 <br />A ugwt 2000 CRWCD * Yana Rher R sin Sm%U Ramw Su 4 - Phze 2 Report * Page * 13 <br />• Site 72 on Morapos Creek <br />• Site 83 on Willow Creek <br />' • Site 84 on Willow Creek <br />Several additional sites (not included in Table 1) were identified for potential field reconnaissance, <br />' based on stakeholder interest and feedback provided at the June 6, 2000 meeting. These include the <br />following sites: <br />• Site 35 on South Fortification Creek <br />' <br />• Site 36 on South Fortification Creek <br />• Site 39 on Little Cottonwood Creek <br />• Site 40 on Little Cottonwood Creek <br />• Site 42 on Little Bear Creek <br />• Site 57 on Big Gulch <br />• Site 71 on Morapos Creek <br />• Site 76 on Willow Creek <br />' In addition, based upon interest expressed during several PBO meetings held throughout the summer, <br />the existing Stagecoach Reservoir and Elkhead Reservoir were added to the list as potential reservoir <br />expansion sites. <br />' The sites outlined above were considered for Phase 2 preliminary field investigation and are presented <br />in Table 2, Pwm-ial Sitcs for Year 2000 Field Ra "nissaaxr. <br />3.4 PHASE 2 POTENTIAL SITES TO BE EVALUATED IN FURTHER DETAIL <br />It was recognized that only a select number of sites from Table 2 could be visited during the summer <br />' of 2000, but that additional evaluation could continue on other sites on parallel tracks. This would <br />assure that potential sites with current stakeholder interest would continue to be addressed. With this <br />in mind, three tracks were established, as follows: <br />' • Track 1: 200 to 2,000 ac-ft sites with current stakeholder interest, benefit to multiple <br />agricultural users, and cost-sharing opportunities. <br />• Track 2: Could be sized to 2,000 to 5,000 ac-ft and potentially serve multiple purposes, <br />including agriculture, off-channel flat water fishery, and PBO flow release requirements. <br />' • Track 3: 200 to 2,000 ac-ft sites with some level of interest, but the need for additional <br />data collection. <br />1 <br />1 <br />wiroaimsn?ax? <br />or?oioo? <br />Both Track 1 and Track 2 sites would undergo preliminary field reconnaissance in the summer of <br />2000 during Phase 2. Additional information gathering would be recommended for Track 3 sites to <br />determine whether field reconnaissance would be warranted in the future. <br />Track 1 sites include: <br />• Site 41 (Little Bear # 1 site on Little Bear Creek) <br />• Site 42 (Little Bear # 2 site on Little Bear Creek) <br />• Site 35 (South Fork # 1 site on South Fork Fortification Creek) <br />• Site 36 (South Fork # 2 site on South Fork Fortification Creek) <br />Margwmy Watson * P0 Bw 774018 * Sam Sp W, Cala?uk 80477 * (970) 879-6260