Laserfiche WebLink
~~ <br />Task 6: If above sites (Task 3) are inadequate, evaluate new sites on the basis <br />of criteria established in Tasks 3 including, but not limited to: <br />- Glenwood geothermal (Colorado) <br />- Haystack geothermal (Colorado) <br />- Grow-out ponds (Colorado/Utah) <br />- Development of spawning channels (Colorado/Utah) <br />- Other <br />December 30, 1989 <br />Task 7: As necessary, implement in-depth engineering assessment including <br />design options and general development and operational costs. For <br />those sites that meet the general criteria established above, provide <br />report for committee review. <br />March 15, 1990 <br />Task 8: Based upon committee review and recommendations develop construction <br />and implementation plan with appropriate schedules. <br />June 15, 1-990 <br /> <br />Objective 6 <br />