Laserfiche WebLink
Task 3: Establish criteria for site/facility evaluation based on Tasks 1, 2, <br />and long-term fish needs. <br />January 30, 1989 <br />Task 4: Re-evaluate the following sites on the basis of criteria established in <br />Tasks 3. <br />Hotchkiss NFH (Colorado) <br />Ouray NWR (Utah) <br />Wahweep Ponds (Utah) <br />Dexter NFH (New Mexico) <br />Rifle SFH (Colorado) <br />Craig 3 Waste Heat (Colorado) <br />Niland Ponds (California) <br />Willow Beach NFH (Arizona) <br />Other <br />February 15, 1989 <br />Task ~: For those that meet the established criteria, implement comprehensive <br />engineering assessment including design options and general <br />development/operational costs. Provide report for committee review. <br />September 30, 1989 <br />