<br />mg ramp at Lemon Reservoir, Colo., IS anticipated by the end of
<br />the year.
<br />
<br />Camping facilities, roads and parking areas at Paonia Reservoir
<br />have been completed.
<br />
<br />At the Pine River site in the Navajo Reservoir Recreation Area,
<br />the water supply and distribution system, the sanitary system and
<br />four comfort stations have been completed. In the Colorado portion
<br />of the area, water system, sanitary system, access roads, and a boat
<br />launching ramp have been completed at the Arboles sites.
<br />
<br />4. PROGRESS OF RETURN AND REPAYMENT OF
<br />FEDERAL INVESTMENT
<br />
<br />Through June 30, 1964, a total of $87,659 has been returned
<br />to the Treasury as repayment of interest and Federal investment.
<br />Of this total $59,560 represents repayment of Federal investment
<br />and $28,099 represents return of interest on municipal and industrial
<br />water investment.
<br />
<br />Repayment contracts which schedule annual payments on irriga-
<br />tion and municipal and industrial water facilities have been executed
<br />with water users' organizations on the following participating
<br />projects.
<br />
<br />3. ALLOCATON OF FEDERAL INVESTMENT
<br />
<br />Section 6 of the authorizing act states that upon completion of
<br />each unit, participating project, or separable feature thereof, the
<br />Secretary shall allocate the total cost of constructing said unit,
<br />project, or feature to the various purposes authorized in the act or
<br />authorized under reclamation law. No formal allocations to the
<br />several purposes to be served by the project have been made of the
<br />cost to June 30, 1964. However, tentative allocations have been made
<br />oLthe totaLestimated cost of projects..now under construction (see
<br />schedule No.6). The tentative allocations are summarized as follows:
<br />
<br />Purpose
<br />
<br />Total
<br />
<br />Amount
<br />1958. '., $1,500,000
<br />2,935,000
<br />1,900,000
<br />450,000
<br />2,212.000
<br />2,320,000
<br />3,400,000
<br />. 33,761,000
<br />900,000
<br />........ 'n... ..... , 960,000
<br />1,025,000
<br />
<br />. ........, 51,363,000
<br />
<br />Central Utah, Vernal Unit-Uintah Water Conservancy District, July 14,
<br />Emery County-Emery County Conservancy District. May 15, 1962
<br />Florida-Florida Water Conservancy District. Dee, 29, 1960 , ..
<br />Hammond-Hammond Conservancy District, Oct, 20, 1959 .
<br />Lyman-Bridger Valley Water Conservancy District, Apr. 8, 1964 ,..
<br />Paonia-North Fork Water Conservancy District, Aug, 21, 1957 ,
<br />San Juan-Chama-Middle Rio Grande Conservancy District, June 25, 1963 ,
<br />City of Albuquerque, June 25, 1963 .,..
<br />Seedskadee---State of Wyoming, June 14, 1962 .
<br />Silt-Silt Water Conservancy District, June 24, 1963 .
<br />Smith Fork-Crawford Water Conservancy District, May 10, 1960 ..
<br />
<br />Amount Percent
<br />(thousands)
<br />
<br />Re'imbursable---;'lfocations: ~----~~-----_._-,_.
<br />lrriga tion
<br />Power __,_.................._....u.__._...____. ....
<br />Municipal and industrial water
<br />
<br />$220,316 21.5
<br />561,102 54,6
<br />35,261 3.4
<br />--_.._-~-----
<br />816.679 79,5
<br />
<br />5. ESTIMATED RATE OF PROJECT REPAYMENT
<br />YEAR BY YEAR
<br />
<br />Total
<br />
<br />Nonreimbursable allocations:
<br />
<br />Flood Control .
<br />Fish and wildlife
<br />Recreation _.........__.._....u_____n_______ n..._ ___ ..__
<br />Irrigation (Navajo Indian irrigation project) 1 m__....m.."___ m ..m..o_o_.
<br />Other nonreimbursable costs: Colorado River fund investigations, non-
<br />Federal contributions, and cost of road relocations under Public
<br />Law 87-874
<br />
<br />Total
<br />
<br />1,609 ,2
<br />36,968 3.6
<br />29,921 2,9
<br />135,070 13,1
<br />6,696 ,7
<br />210,264 20,5
<br />
<br />Final cost allocation of the Federal investment to power, irriga-
<br />tion, and to other purposes has not been made. Accordingly, the
<br />estimated rate of progress of project repayment year by year of the
<br />investment to be so allocated is not included in this report.
<br />
<br />Total
<br />
<br />1,026,943
<br />
<br />100,0
<br />
<br />'Classified as nonreimbursable pending determination of repayment capability per see, 6 of the
<br />act of Apr, 11, 1956,
<br />
<br />NOTE.-The above allocation includes only those projects now under construction.