Laserfiche WebLink
<br /> <br />mg ramp at Lemon Reservoir, Colo., IS anticipated by the end of <br />the year. <br /> <br />Camping facilities, roads and parking areas at Paonia Reservoir <br />have been completed. <br /> <br />At the Pine River site in the Navajo Reservoir Recreation Area, <br />the water supply and distribution system, the sanitary system and <br />four comfort stations have been completed. In the Colorado portion <br />of the area, water system, sanitary system, access roads, and a boat <br />launching ramp have been completed at the Arboles sites. <br /> <br />4. PROGRESS OF RETURN AND REPAYMENT OF <br />FEDERAL INVESTMENT <br /> <br />Through June 30, 1964, a total of $87,659 has been returned <br />to the Treasury as repayment of interest and Federal investment. <br />Of this total $59,560 represents repayment of Federal investment <br />and $28,099 represents return of interest on municipal and industrial <br />water investment. <br /> <br />Repayment contracts which schedule annual payments on irriga- <br />tion and municipal and industrial water facilities have been executed <br />with water users' organizations on the following participating <br />projects. <br /> <br />3. ALLOCATON OF FEDERAL INVESTMENT <br /> <br />Section 6 of the authorizing act states that upon completion of <br />each unit, participating project, or separable feature thereof, the <br />Secretary shall allocate the total cost of constructing said unit, <br />project, or feature to the various purposes authorized in the act or <br />authorized under reclamation law. No formal allocations to the <br />several purposes to be served by the project have been made of the <br />cost to June 30, 1964. However, tentative allocations have been made <br />oLthe totaLestimated cost of projects..now under construction (see <br />schedule No.6). The tentative allocations are summarized as follows: <br /> <br />Purpose <br /> <br />Total <br /> <br />Amount <br />1958. '., $1,500,000 <br />2,935,000 <br />1,900,000 <br />450,000 <br />2,212.000 <br />2,320,000 <br />3,400,000 <br />. 33,761,000 <br />900,000 <br />........ 'n... ..... , 960,000 <br />1,025,000 <br /> <br />. ........, 51,363,000 <br /> <br />Central Utah, Vernal Unit-Uintah Water Conservancy District, July 14, <br />Emery County-Emery County Conservancy District. May 15, 1962 <br />Florida-Florida Water Conservancy District. Dee, 29, 1960 , .. <br />Hammond-Hammond Conservancy District, Oct, 20, 1959 . <br />Lyman-Bridger Valley Water Conservancy District, Apr. 8, 1964 ,.. <br />Paonia-North Fork Water Conservancy District, Aug, 21, 1957 , <br />San Juan-Chama-Middle Rio Grande Conservancy District, June 25, 1963 , <br />City of Albuquerque, June 25, 1963 .,.. <br />Seedskadee---State of Wyoming, June 14, 1962 . <br />Silt-Silt Water Conservancy District, June 24, 1963 . <br />Smith Fork-Crawford Water Conservancy District, May 10, 1960 .. <br /> <br />Amount Percent <br />(thousands) <br /> <br />Re'imbursable---;'lfocations: ~----~~-----_._-,_. <br />lrriga tion <br />Power __,_.................._....u.__._...____. .... <br />Municipal and industrial water <br /> <br />$220,316 21.5 <br />561,102 54,6 <br />35,261 3.4 <br />--_.._-~----- <br />816.679 79,5 <br /> <br />5. ESTIMATED RATE OF PROJECT REPAYMENT <br />YEAR BY YEAR <br /> <br />Total <br /> <br />Nonreimbursable allocations: <br /> <br />Flood Control . <br />Fish and wildlife <br />Recreation _.........__.._....u_____n_______ n..._ ___ ..__ <br />Irrigation (Navajo Indian irrigation project) 1 m__....m.."___ m ..m..o_o_. <br />Other nonreimbursable costs: Colorado River fund investigations, non- <br />Federal contributions, and cost of road relocations under Public <br />Law 87-874 <br /> <br />Total <br /> <br />1,609 ,2 <br />36,968 3.6 <br />29,921 2,9 <br />135,070 13,1 <br />6,696 ,7 <br />210,264 20,5 <br /> <br />Final cost allocation of the Federal investment to power, irriga- <br />tion, and to other purposes has not been made. Accordingly, the <br />estimated rate of progress of project repayment year by year of the <br />investment to be so allocated is not included in this report. <br /> <br />Total <br /> <br />1,026,943 <br /> <br />100,0 <br /> <br />'Classified as nonreimbursable pending determination of repayment capability per see, 6 of the <br />act of Apr, 11, 1956, <br /> <br />NOTE.-The above allocation includes only those projects now under construction. <br />