Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. using agreed-upon methods, analyze selected data and develop category <br />2 (data-generated) HSI curves. <br /> <br />3. Identify data gaps and, using expert judgement, develop interim HSI <br />curves for those life stages and variables for which data are sparse. <br /> <br />4. Fully document all phases of the project. <br /> <br />5. Attain consensus (approval) by species experts on all phases of the <br />project. <br /> <br />WORK ELEMENTS <br /> <br />The general format for the project involved having BIO/WEST assimilate and <br />sununarize the available data and then, during two workshops, develop a con- <br />sensus of the spec;::ies experts on how the data would be analyzed for curve <br />development. This final report sununarizes the methods and results of the <br />project. The objectives, methods, and results of each task are described, and <br />the final Habitat suitability Index curves are presented with accompanying <br />documentation. The project was divided into the six work elements (Table 1). <br /> <br />Table 1. HSI curves project schedule. <br /> <br />Task <br /> <br />Work element <br /> <br />Date of completion/performance <br /> <br />A <br /> <br />Data set summaries, summary tables, <br />and HSI curve summaries. <br /> <br />December 12, 1986 <br /> <br />Documentation of Workshop #1 . <br /> <br />January 5-9, 1987 <br />January 23, 1987 <br /> <br />B <br /> <br />Workshop U. <br /> <br />c <br /> <br />Draft Report with curves <br /> <br />March 20, 1987 <br /> <br />D <br /> <br />Workshop #2. <br /> <br />March 30-April 3, 1987 <br /> <br />E <br /> <br />Draft Final Report <br /> <br />April 17, 1987 <br />May 8, 1987 <br /> <br />Documentation of Workshop #2 . <br /> <br />F <br /> <br />Final Report <br /> <br />June 19, 1987 <br /> <br />2 <br />