My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7332
CWCB
>
UCREFRP
>
Public
>
7332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:30 PM
Creation date
5/17/2009 11:11:23 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
7332
Author
Valdez, R. A., et al.
Title
Final Report Habitat Suitability Index Curves for Endangered Fishes of the Upper Colorado River Basin.
USFW Year
1987.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />2. using agreed-upon methods, analyze selected data and develop category <br />2 (data-generated) HSI curves. <br /> <br />3. Identify data gaps and, using expert judgement, develop interim HSI <br />curves for those life stages and variables for which data are sparse. <br /> <br />4. Fully document all phases of the project. <br /> <br />5. Attain consensus (approval) by species experts on all phases of the <br />project. <br /> <br />WORK ELEMENTS <br /> <br />The general format for the project involved having BIO/WEST assimilate and <br />sununarize the available data and then, during two workshops, develop a con- <br />sensus of the spec;::ies experts on how the data would be analyzed for curve <br />development. This final report sununarizes the methods and results of the <br />project. The objectives, methods, and results of each task are described, and <br />the final Habitat suitability Index curves are presented with accompanying <br />documentation. The project was divided into the six work elements (Table 1). <br /> <br />Table 1. HSI curves project schedule. <br /> <br />Task <br /> <br />Work element <br /> <br />Date of completion/performance <br /> <br />A <br /> <br />Data set summaries, summary tables, <br />and HSI curve summaries. <br /> <br />December 12, 1986 <br /> <br />Documentation of Workshop #1 . <br /> <br />January 5-9, 1987 <br />January 23, 1987 <br /> <br />B <br /> <br />Workshop U. <br /> <br />c <br /> <br />Draft Report with curves <br /> <br />March 20, 1987 <br /> <br />D <br /> <br />Workshop #2. <br /> <br />March 30-April 3, 1987 <br /> <br />E <br /> <br />Draft Final Report <br /> <br />April 17, 1987 <br />May 8, 1987 <br /> <br />Documentation of Workshop #2 . <br /> <br />F <br /> <br />Final Report <br /> <br />June 19, 1987 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.